Laserfiche WebLink
DATE/TZHE <br />TYPE <br />OCCUPANCY <br /> <br />MARION COUNTY BUILDING INSPECTION <br />COMMUNITY DEVELOPMENT CENTER <br /> <br /> 285 Church StreetNE · Room 132 · Salem, Oregon97301-3670 <br /> Office Hours:8:00-4:30 · Phone:(503)588-5147 · 24-HRInspectlon Llne:~03)373-4427 <br /> <br /> S[TE EVALUATION APPROVAL <br /> ~ ~4/22/97 11~48 APPROVAL NO : 97-62317 <br /> = SESP STATUS = APPROVED <br /> = R-3 APPROVED = ~4/22/1997 <br /> <br /> PAGE 3 <br /> CARE NOT TO ALTER THE NATURAL TOPSOIL. WITHIN THE DRAINFIELD <br /> SITES PRI[IR TO INSTALLATION. DRY SOIL CONDITIONS ARE RECO- <br /> MENDED TO PREVENT SOIL COMPACTION DURING INSTALLATION. <br />2. The attached ORANGE CARD ~,}ust be posted at the couotX road. <br />3. The site Must be prote~ted from traffic, livestock, ~arMirlg <br /> or other damaging activities. <br />4~ This system Must be inspected prior to cover. When work is <br /> complete, call oor Automated Inspecti~? Request Line, <br /> at 37~-4427, to request an "801" PRE-COVER inspection. <br /> Leave a Message for the i~spector to i~?ic:ate the name of <br /> the installer a~d phone number, the si~e of tank installed <br /> and the length of drainfield. An inspection should be <br /> completed w~thi~ seven (7) days. <br /> <br /> <br />