Laserfiche WebLink
DATE/TZHE <br />PERHZT HO <br />TYPE <br />CLASS <br /> <br />MARION COUNTY BUILDING INSPECTION <br /> COMMUNITY DEVELOPMENT CENTER <br /> <br /> 285 Church Street NE · Room 132 · Salem, Oregon 97301-3670 <br />Office Hours: 8:00-4:30 · Phone: (503) 588-5147 · 24-HR Inspection Line: (503) 588-7904 <br /> <br /> SITE EVALUATION APPROYAL <br /> = ~8/29/95 eS=B2 STATUS = APPROVED <br /> = 95-14325 APPLIED = B7/16/1995 <br /> : SE APPROVED = B8/29/1995 <br /> <br /> = R-3 PAGE: <br /> line). When requesting the inspection, be sore to Qive <br /> installer's name, phon6 number, size of tat~k, and t6tal <br /> leng'th of drai~4field. Inspection will be completed within <br />· seven days of request. <br /> 4. Construct the sand filter drainTields withi~ the immediate <br /> a~ee of the soil test pits. Soil conditions a~e m~gin~l <br /> the sa~d filter/capping ~ill consideration. Use ca~e not <br /> alter the natural topsoil p~o~ to inst~llation. De~ailed <br /> plans o~ the sand filter/cappin~ ~ill installation must be <br /> submitted to our oT~ice ~or ~ewew before the septic permit <br /> can be considered. Site conditions linit the installation to <br /> drysoil s~mme~ season construction. <br /> 5. For e SAND FILTER SYSTEM. see the attached Sand Filter <br /> System Re§ui~ements ~o~ Plans". Sand Filter' desiQn and <br /> construction is very detailed and ~ ~£~ licensed <br /> or consultant is ~ecommended to assist with p~epa~ation o~ <br /> plans. See the attached list ~or consultants. The system <br /> sh~I1 be designed and operated as pe~ OAR 340-71-29~ <br /> ~0o. Two sets of detailed plans ~or the installation oT t~e <br /> s~d filte~ system nust be submitted at the time applicatio~ <br /> is Made ~or the permit to install the sZstem. If · site- <br /> built concrete box is osed as the sand filter conteine~, <br /> separate building @ermit is also requi~ed. <br /> 6. A ceppin~ ~ill d~al~'lfield is requi~ed in conjunction with <br /> the septic system approval. See the attached "Caooino Fill" <br /> information sheet ~or instructions. -' <br /> 7. CAPPIN~ FILL SYSTEMS shall be constructe~ betwee~ d~ne <br /> al~d October 1 or du~ing s~ch times when ~uildin§ Inspection <br /> sta~ ~inds soil moisture conditions acceptable. The <br /> CAPPIN~ FILL material must be inspected and a@p~oved p~ior <br /> to placement. The ~ill shall be of the same textural <br /> class, o~ one class ~iner, then the native topsoil. The <br /> disposal ~ield ~ee most be scarified to destroy any <br /> vegetative net on the s~.~face. Fill material shall be <br /> evenly graded to a Tinal depth o~ sixteen (16) inches over <br /> the gravel. <br /> 0. An e~l~ent li~t pump may be necessary to consOl'oct 'the <br /> dis@os~l ~ield in the approve¢ a~ee and e~ the co~rect <br /> depth. <br /> <br /> <br />