Laserfiche WebLink
MARION COUNI BUILDING INSPECTION <br /> <br /> 3150 Lancaster Dr. N.E. · Suite C · Salem, Oregon 97305-1398 <br />Office Hours: 8:00-4:30 · Phone: (503) 588-5147 · 24-HR Inspection Line: (503) 373-4427 <br /> <br /> BUILDING PERMIT <br />DATE/TIME = ~8/~1/97 I5=58 PERMIT HO : 97-65384 <br />TYPE : Residential accessory strut[ STATUS : ISSUED <br />CLASS : ISSUEO : 88/B1/1997 <br />OCCUPANCY = R-~ TO EXPIRE ~ 81/28/1998 <br />CONSTRUCTION = V-N PAGE 2 <br /> <br />PLAN REVIEW COMMENTS AND CONDITIONS <br /> <br />R~iQUIRED SETBACKS. Front: I..e ft: 10 Right: 10 Rear: 30 Special. <br /> <br /> ]~ THIS PLAN REVIEW WAS COMPLETED BY S. FREILINGER ON 7/~1/97. <br /> 2. Approval of sub~itted pla~s is net an approval of OMissions <br /> or oversights by this office or of noncompliance with any <br /> applicable regu].ations of local govern~e~t. <br /> 3. Approved address numbers shall b~ painted or affixed to the <br /> fro~t of the building i~ ~ contrasting and highly visible <br /> color, net less than six (6) ~och~s in heiqht for <br /> commercial u~ or four (4) inches in heigh~ for residential <br /> us~. The numbers shell be affixed prior [o final <br /> inspection. (51~) (UFC 18.~81) (ORD 774) <br /> 4. A roadside Mar~r shall be placed at the access point with <br /> address noMbers in m contrasting and highly visible color, <br /> ~ot less than five (5) inches in height'for COMMercial use, <br /> or three (3) laches in height ~or residential use. <br /> 5. The INSPECTION RECORD GREER CARD shall be posted in <br /> visible and readily accessible loc~tion throughout <br /> construction. <br /> APPROVE~ CONSTRUCTION PLANS AND PLAN REVIEW COMMENTS AND <br /> CONDITIONS ~hall be kept on the site of the building or work <br /> at the time of ins~pectioo. <br /> 4. Wo~k May proceed only at the directio~ of the inspector. <br /> To request an in~p~ction of completed work, DIAL <br /> (58~l ~7~-44~7 (24-hour inspect[m~ line) prior to 7:88 AM to <br /> receive .same day service. <br /> 7. USE INSFECTION CODES WHEN REQUESIlNG INSPECTIONS. <br /> ~.~,. - FOOTINGS~ stake property lin~s and call before peur <br /> 18~ UNDERFLOOR/POST & BEAM <br /> 1.~4 - FRAMING, ~11 when w~ether tight, chimney/fireplace <br /> ~nstmlled, ell baCk~rng, fire ~locking, stairs, <br /> soffits in place, nluMbing, electrical, Mechanical <br /> COMp]et~, trL[ss ~e~ails pO~ted~ flood elevation <br /> cert~ fica[ion submitted. <br /> ~5 - INSU[ATION~ cell before covered <br /> 1~ DRYWALL - call befere taped <br /> 1~7 - POLE HOI_ES~ cai1 befere pour <br />8. l~8 FOUNDATION WALl. R~BAR <br /> ~18 - MASONRY REBAR <br /> I11 - SPECIAL BRACE PANELS <br /> ~12 - MASONRY FIREPLACE PRE-COVER <br /> 11~ - ~USPENQED CEILING <br /> 114 - ROOF NAILIN~ <br /> 115 - ~EMOLI~ION INSPECT[ON <br /> 116 - OTHER STRUCTURAL INSPECTION <br /> 1~? - ~RHCTURAI_ FINAL <br />?. Approved far pr?ate noo--COMMe~'cial use only. <br />1~. TEOSS DESIGN. Roof trusses ere reqoired to be designed by <br /> a~ Oregon re~stered EnQineer or Architect. For trusses <br /> M~nu~mctured by an approved fabricetio~'~ pla~t, have the <br /> d~siqo and layoot drawings available at the coos[ruction <br /> site-for the franking i~speciton,, Ail jobsite cutting <br /> Mod:ifi(:~tio¥~ of the roof trusses sheI! be clearly sho~n in <br /> the en~ineers~s design calculations and drawings. If trusses <br /> ~re to be b~ilt at t~e jobsite, submit the engsneer~s desigo <br /> ~d con.~.ruct~o~ plan. to the Marion Couoty Building Depart- <br /> MeO~ p¥'~or ~o start of coos[ruction and have the approved <br /> drawiMqS ~wil~ble at the site for the freMinq inspection. <br />i~1. BP~ ABP. Th~s structure oses e ce~biMation o~ Brace Wall <br /> P~ls (~P) e~'~d Alteroat~ Braced Wall Pa~'~els (ABP) to Meet <br /> <br /> <br />