Laserfiche WebLink
TO: <br /> <br />Fax Phone 588. 7948 <br /> <br />CC: <br /> <br />REMARKS: x Urgent <br /> <br />Tim Berkay - 390 - t051 <br /> <br /> X For your review <br /> <br />JOB: Pole Building for LOUIS MEZA <br />FILE No.: 6-97-15 <br /> <br />ADDRESS: 9003 SHAW SQUARE Rd. <br /> SHAW, OREGON <br /> <br /> Date Jsnuar~ t0; 199B <br /> <br />INumber of pages including cover <br />sheet 5 <br /> <br />FROM: <br /> <br />Nicholas Jasper <br />6687 Skyline Road S. <br />Salem, Oregon 97306 <br /> <br />Phone ~503) 378.05f0 <br />Fax Phone (503) 378 0510 <br /> <br />X ReplyASAP [] PleaseCorement <br /> <br />MARION' COUNTY <br />BUILOING INSPECTION <br /> <br />I spoke with Tim Berkey on tho phone last night about the Louis Maze job (Activity No. 97 - 04974). Mr. Meza <br />did request two chengem to the original building deeign. Mr. Maze requesfed that Tim Berkey install a 4'-0' x <br />?'.0" Dutch Door in the gable end at · corset. Ha aleo requested Tim to install two 4/0 - 3/0 windows in the <br />other gable m~d, Note thM these were requested after the pa~nitting and design process. I have examined <br />the calculeUone for this structure and determined that these ohanges will not reduce the structural capacity <br />of the building or reduce the economic or service life of the atn,cture. I have attached a revised drawing and <br />the appropriate page from the calculation to substantiate and dooument these Ghangea. <br /> <br />Please contact me if you have any questions or conoerna. I appreciate your attention to the details of the <br /> <br />engineering package. <br /> <br />Nicholas Jasper, P.E. <br /> <br />IEXPIRES: 6/30/ ~$ J <br /> <br />TO~ 8HDS¥£ SYqOHDIN OTgOg~ggog ~V~ T~:£O 96/9l/T0 <br /> <br /> <br />