Laserfiche WebLink
MARION COUNTY BUILDING INSPECTION <br /> <br /> 3150 Lancaster Dr. N.E. · Suite C * Salem, Oregon 97305-1398 <br />Office Hours: 8:00-4:30 · Phone: (503) 588-5147 * 24-HR Inspection Line: (503) 373-4427 <br /> <br />R~ kglIiFRED SFTI~ACKS: Front= <br /> <br />PLAN REVIEW COMMENTS AND CONDITIONS <br /> <br /> Left: lB Right: lB Rear= 3B Special: <br /> <br />t. THIS PLAN REVIEW WAS COMPLETED BY H..JONES ON 10/20/97. <br />2. Approval of submitted plans is not an approval of omissions <br /> or oversights by this office or of noncompliance with any <br /> applicable regulations of local governmenT. <br />3. A~pr9ved address numbers ~ha11 he painted or affixed to the <br /> front of the nuilding in a contrasting and highly visible <br /> color, not less than six (&) inches in height for <br /> commercial use or four (4) inches in height for residential <br /> use. The numbers shall be affixed prior to final <br /> inspection. (51J) (DFC 1B.~B]) (ORD 774) <br />4. A roadside marker shall be placed at the access point with <br /> address numbers in a contrasting and highly visible color, <br /> not less than five (5) inches in height for commercial use, <br /> or three (~) inches in height for residential use. <br />5. The INSPECTION ~E~ORD GREFN CARD shall be posted in a <br /> visible and readily accessible location throughout <br /> construction. <br /> APPROVED CONSTRUCTION PLANS AN~ PLAN REVIEW COMMENTS AND <br /> C~N~TI~NS sh~ll be k~pt on the site of the building or work <br /> aT Toe Time OT inspection. <br />A. Work may proceed only at the direction of the inspector. <br /> To request an inspection of completed work, OIAL <br /> (~B~) ~7~~4427 (~4-hour inspection line) prior to 7~00 AM to <br /> receive same day service. <br />7. U~E TflSPECTION COOKS WHEN REQUESTING INSPECTIONS: <br /> lB? - FOOTINGS, stake property lines and call before pour <br /> 103 UNDERFLOOR/POST & ~.AME <br /> IR4 - FRAMING, call when weather t~ght, chimney/fireplace <br /> installed, all backing, fire Blocking. stairs, <br /> soffits in place, plumbing, e]ectrical~ ~echanical <br /> complete, truss details posted~ flood elevation <br /> certification submitted. <br /> 105 - IN~ULATION~ call before covered <br /> 106 DRYWALL - call before taped <br /> 107 - POLE HOLES, call before pour <br />8. lOB FOUNDATION WALL RE,AR <br /> ~0 - MASONRY RE,AR <br /> ~]l - SPECIAL ~RACE PANELS <br /> 112 - MASONRY FIREPLACE PRE-COVER <br /> ll~ -SUSPENDFD CEILING <br /> lt4 - ROOF NAILING <br /> 1~5 -DFMOLITION INSPECTION <br /> 1~6 - OTHER STRUCTURAL INSPECTION <br /> 199 - STRUCTORAL F~NAL <br />9. FOR F~RE SPRINKLER SYSTEMS: 504 - FLOW TEST <br /> 505 - FIRE ALARM TEST <br /> 506 - TRIP TEST <br /> 507 - FLUSHING <br /> 50S - COHMERCIAL HO0~ SUPPRESSION SYSTEM <br /> 5~? - SPRINKLER SYSTEM/OVERHEAD <br /> 5~B - BPRINELER SYSTEM/UNDER,ROI!ND <br /> ~99 - FIRE ~PRINKI.ER FINAL <br /> Approved for ~rivate non-commercial use only. <br /> L. OT DRAINAGE. Lots shall he ~rovided ~ith adequate drainage <br /> and shall be graded so as to ~rain SUrTace water away <br /> foundation walls. The ~rade away from foundation walls ~hall <br /> fa~] a m~ninum of 6 inches within the first 10 feet. Where <br /> <br /> <br />