My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SESPNEW - 1484791
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
97-XXXXX
>
SESPNEW - 1484791
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2010 10:59:48 AM
Creation date
9/2/2004 2:15:11 PM
Metadata
Fields
Template:
Permits
Permit Address
14178 KEIL RD NE
Permit City
Aurora
Permit Number
555-97-09408
Parcel Number
041W11D 00200
Permit Type
SESPNEW
Permit Doc Type
Permit Document
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CERTIFICqTE OF SATISFACTORY COMPLETION <br /> <br />DATE/TIME <br /> <br />05/27/98 13:15 <br /> <br />PERMIT NO <br />STATUS <br />ISSUED <br />PAGE <br /> <br />97-09408 <br />COFC <br />12/24/1997 <br />1 <br /> <br />CITY: MARION COUNTY <br /> <br />WORK DESC SESP: SITE 1 FARM DWELLING <br /> <br />SITE ADDRESS <br /> <br />14178 KEIL RD NE AR <br /> <br />SUBDIVISION <br /> <br />TAX ACCOUNT <br /> <br /> PARCEL SIZE <br /> <br />OWNER <br /> ADDRESS <br /> <br />SITE 1 LOT: BL: <br /> <br />40381-000 <br /> <br /> 40.OAC <br /> <br />JENKS RAYNA L <br />PO BOX 67 <br />AUROP~q <br />OR <br /> <br />97002 <br /> <br />DEQ INSTALLER <br />ADDRESS <br /> <br />DEQ LICENSE: <br /> <br />PROJECTED DAILY SEWAGE FLOW: 450 GALLONS <br /> <br />PERMIT SYSTEM TYPE: STANDARD <br /> <br />The septic system located at the above address has been inspected and found <br />to be in compliance with the rules of the Environmental Quality Commission and <br />the conditions of the permit. This CERTIFICATE OF SATISFACTORY COMPLETION is <br />issued as evidence that the system complies with the rules. The Certificate is <br />valid for a period of five (5) years for connection of the system to the facility <br />for which it was constructed. <br /> <br />See attached As-Built drawing for details of the constructed system, <br /> <br />DONALD E. WOODLEY, MARION COUNTY BUILDING OFFICIAL / BY CLYNCH <br /> <br /> Marion County Building Inspection <br /> 3150 Lancaster Dr. N.E., Suite C Salem, Oregon 97305-1398 <br />Office Hours: 8:00-4:30 Phone: (503)588-5147 24-hr Inspection Line: (503)373~4427 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.