Laserfiche WebLink
FOR CITY VALIDATION <br />: Received by: <br /> Date: <br /> <br /> MARION COUNTY <br />' ' ' BUILDING INSPECTION DIVISION <br /> 3150 LANCASTER DR NE - SUITE C <br /> SALEM OREGON 97305-1398 <br /> I <br /> <br />I, LOCATION OF INSTALLATION <br /> <br />24 hr. InlpectlGn Lint <br />FAX: <br /> <br />MECHANICAL PERMIT APPLICATION <br />Please complete afl Sections, I through $ <br /> <br />Job Description! <br /> <br />p .ER~FFS ARE NON-TRANSFERABLE AND EXPIRE IF WORK IS NOT I <br /> STARTED WITHIN I~0 DAYS OF ISSUANCE OR IF <br /> <br />FOR OWNER INSTALLATIONS <br /> <br />Pflo~e <br /> <br />Owner ~lease prim) <br /> <br />Date: <br /> <br />Issued by: <br /> <br /> 4. FEE SCHEDULE (C~nplet¢ nad entel' total hi AI below) <br /> <br /> RESIDENTIAL J~: COMMERCIAL <br /> USE OF STRUCTURE: <br /> .NEW ~ ALTERATION ~ ADDITION J~°~-LOCATION <br />[I'~GAS [~ or ELECt ~lC ~ <br /> <br /> FEB $1o.o0 <br /> <br />FORCED AIR FURNACE <br /> <br /> ~ IIX),000 BTU $ %00 <br /> <br /> Floor Furnace S 6.00 <br /> Sus~nd~t Hmcr S 6.00 <br /> Wall Heater $ 6.00 . <br /> ~ Mo~tcd Homer $ <br /> <br />HHAT P;~fP <br />under ~ To~ J ,, $ <br />3 Ton m~d up <br /> <br />AIR CONDITIONER <br />un~r 3 Ton $ 6.50 <br />3 Ton ~nd up $11.00' ~'~ <br />EvapomiveCoolcr $ 4.50 <br />Cemme~ial / tnduau/ai Incipcrator <br /> <br /> Gu Log Lighte~ $ 7.50 <br /> GM n~'t~qu~ $7.50 <br /> O~er S 7.~) <br /> <br />OAS PIPING SYSTEM <br />I-4 ou~:~ (~ou~l) S 2.~ <br />4 e~ up ~tle~ (~r ~c0 S ~0 <br /> <br />m applJa~e ~il S 3.~ <br />~HHR (~ ~ulr~d by ~1~ 0~1) <br />DWELLINO PE~ L~EL ~of~h <br /> <br />NIC <br /> <br /> 3. PLAN REVIEW SECTION <br />IMarion County does not require a plan review. <br /> We will provide plan review service it'you complete <br /> Section 5[3 and subm!t two (2) sets of plans and <br /> specifications with thts application. <br /> <br />5. FF~S <br /> <br /> ~. Add 5% s~harge (.05 x A 1) <br /> <br /> TOT~ ~O~ D~ <br /> <br /> <br />