Laserfiche WebLink
DATE/TIME <br />TYPE <br />UGB: <br /> <br /> MANUFACTURED DWELLING PERMIT <br /> : 02/01/99 09:17 <br /> : New Manufactured Dwelling <br />SITE: FD <br /> <br />10. <br /> <br />11, <br /> <br />13. <br /> <br /> PERMIT NO 98-05107 <br /> STATUS DENIED <br /> ISSUED <br /> TO EXPIRE 12/20/1998 <br /> PAGE 3 <br />provided on at least one side of stairways of more than <br />three risers, The handgrip portion of handrails shall be <br />not more than 2 5/8 inches in cross-sectional dimension, or <br />the shape shall provide an equivalent gripping surface, <br />Handrails shall be mounted between a minimum of 30 inches <br />and a maximum of 38 inches. They shall be continuous the <br />full length of the stairs. Ends shall be returned or shall <br />terminate in newel posts or safety terminals. (R-214.1) <br />A minimum 3' x 2' landing shall be required on each side of <br />an egress door. The floor or landing shall not be more <br />than one and one-half inches lower than the top of the <br />threshold, (R-212) Exception: The landing on the <br />exterior side of an exterior doorway shall not be more than <br />8 and 1/4 inches below the top of the threshold. <br />Porches, balconies or raised floor surfaces located more <br />than 20 in. above the floor or grade shall have guardrail <br />not less than 36 inches in height. Required guardrail shall <br />have intermediate rails or ornamental closures which will <br />not allow passage of an object 6 in, or mere in diameter, <br />Horizontal spacing between the vertical members in required <br />guardrails shall be a maximum of 4 inches at the nearest <br />~int between the members, (R-214.2) <br /> NUFACTURED DWELLINGS MAY BE USED FOR LABOR HOUSING PROVIDE <br />D THE r~qNUFACTURED DWELLING: (1) IS LOCATED IN A LABOR CAMP <br />AS DEFINED IN OAR 437-02-0142 WHICH CONSISTS OF: (A) NOT MOR <br />E THAN SIX MANUFACTURED DWELLINGS ON A LOT OR PARCEL OR AGGR <br />EGATION OF LOTS OR PARCELS ACCORDING TO ORS 446.055; OR (B) <br />FOUR OR MORE MANUFACTURED DWELLINGS IN A MANUFACTURED DWELLI <br />NG PARK, A TEMPORARY MOBILE HOME PARK OR A COMBINATION PARK <br />ACCORDING T ORS 446.002(2&) AND (32); SUBMIT DOCUMENTATION <br />OF PROPERTY BEING APPROVED AS A LABOR CAMP, <br />(2) IS NOT OCCUPIED BY MORE THAN TEN PERSONS NOT RELATED BY <br />BLOOD OR MARRIAGE; <br />(2) H~S A M~J<IMUM OF FIVE BEDROOMS: <br />(4) REMAINS IN CONFORMANCE WITH ALL APPLICABLE FEDREAL MANUF <br />ACTURED HOME CONSTRUCTION AND SAFETY STANDARDS AND STSTE REG <br />ULATION: <br />(5) HAS, PRIOR TO OCCUPACNY. AN OPERABLE SMAKE DETECTOR LOCA <br />TED WITHIN EACH BEDROOM; <br />(6) IS. PRIOR TO OCCUPANCY. INSTALLED AND CONNECTYEDD TO UTI <br />LITIES ACCORDING TO THIS STANDARD; <br />(7) CONFORMS TO THE OREGON OCCUPATIONAL SAFETY AND HF~qLTH CO <br />DE, OAR 437; AND <br />(8) NOTWITHYSTANDING SECTION 206(H). HAS A CERTIFICATE OF OC <br />CUPANCY ISSUED BY THE AUTHORI~ HAVING JURISDICTION PRIOR TO <br />OCCUPANCY, <br />THIS APPLICATION IS **DENIED**. WE HAVE NOT RECEIVED AMY INO <br />ORMATION/DOCUMENTATION AS REQUESTED ON THE LABOR CAMP BEING <br />APPROVED, <br /> <br /> <br />