Laserfiche WebLink
DIRECTOI~ <br />Craig O. Luedeman <br /> <br />BUILDING INSPECTION <br /> <br />Marion County <br /> <br /> OREGON <br />COMMUNITY DEVELOPMENT <br />DEPARTMENT <br /> <br />MEMO: <br /> <br />Date: Sept. 9, 1998 <br /> <br />To: Gary Sparks <br /> <br />From: Zan Ewing <br /> <br />Re: Septic application 98-07339 <br /> <br />Dear Mr. Sparks, <br /> <br />@©PV <br /> <br />I visited you site yesterday to do the site evaluation for your septic tank installation approval. <br />The draiafield lines were staked with 3' to 6' of fall ia the Jmes. The Jmes need to be revel <br />plus or minus 1" (please refer to the attached stakeout procedure). Due to the limited size of <br />the lot the lines must be restaked to contour and a revised site plan submitted to reflect the <br />stakeout. In addition the lot comers must be staked to assure the system is located entirely <br />on the lot. If the lot extends onto another lot an easement must be submitted for the <br />drainfield use. <br /> <br />Give me a call if you would like to discuss this or if you have any questions on this matter. <br />When we receive the additional infm-mation a revisit will be scheduled. <br /> <br />Sin%erely,/~ <br /> <br />R[g~sTed Sanitarian <br /> <br />Community Developmem Center - 3150 Lancaster Dr NE, Suite C - Salem, Oregon 97305-1398 <br /> <br /> <br />