Laserfiche WebLink
PLANT WIDE - ALL SPACE LOCATED IN AND AROUND ELECTRICAL EQUIPNIENT <br />IS TO COHPLY WITH ARTICLE I I O- I ~i, THIS INCLUDES PORTABLE <br />EQUIPMENT THAT ~4AY BE STORED IN FRONT OF ELECTRICAL PANELS, <br />PLEASE TRAIN PERSONNEL ON THIS RULE, LONG TERH SOLUTION MAY BE <br />TO INSTALL PERMANENT GUARDS, <br /> <br />ROHN BUILDING: <br />· TABLE SAW - PLEASE RE-ROUTE CORD SO IT tS NOT PRONE TO PHYSICAL <br /> DAMAGE. ALSO, AT DUST COLLECTOR, PLEASE REMOVE THE DISCONNECT <br /> AND INSTALL A CORD CAP AND RECEPTACLE. (PORTABLE EQUIPMENT). <br /> I I 0-3. EXAMINATION, IDENTIFICATION, INSTALLATION~ AND USE OF <br /> EQUIPMENT. <br /> <br />· PLEASE SUPPORT 4 SQUARE BOX PROPERLY AND IF POWER IS NEEDED IN <br /> THE TOOL CABINET, RUN A PERMANENT WIRING HETHOD. 400-8. USES <br /> NOT PERMITTED. <br /> <br />IF YOU HAVE ANY QUESTIONS REGARDING THIS INSPECTION REPORT, PLEASE CALL <br />US At (503) 588-5 147. <br /> <br />AGAIN, THANK-YOU FOR ALLOWING iVICBJ TO SERVE YOU AND YOUR ORGANIZATION. <br /> <br />CORDIALLY, <br /> <br />DAVID M. HILL <br />ELECTRICAL ~ NSPECTOR <br /> <br />DON WOODLEY <br />BUILDING OFFICIAL <br /> <br />3 <br /> <br /> <br />