Laserfiche WebLink
DATE/TIME <br />TYPE <br /> <br /> SEPTIC PERMIT <br />: 04/08/99 10:51 PERMIT NO <br />: SP STATUS <br /> ISSUED <br /> TO EXPIRE <br /> PAGE <br />locating the access onto the site. <br />THE APPROVED SEPTIC SYSTEM AREA MUST BE PROTECTED from any <br />vehicular traffic, livestock and farming activities. Other <br />activities such as lo~ging, excavating or filling, driveway <br />placement or any similar activities may also damage the soil <br />in the area and adversely affect the septic system approval. <br />The areas of the initial septic system and the future repair <br />system must both be protected. <br />A CURTAIN DRAIN IS REQUIRED as part of this system. The <br />curtain drain trench must be constructed a mimimum twelve <br />(12) inches wide by 42 inches deep with 26 inches <br />of clean gravel placed over a four (4) inch smooth wall, <br />~erforated pipe. The curtain drain must be located at least <br />en (lO) feet upslope from the disposal field and must <br />discharge through a watertight non-perforated pipe beside or <br />below the disposal field. A minimum separation of ten (lO) <br />feet is required from the septic tank if the tank is located <br />upslope of the curtain drain and five (5) feet if the tank <br />is located downslope of the curtian drain. <br />THIS SEPTIC SYSTEM MUST BE INSTALLED DURING THE DRY SUMMER <br />SEASON ONLY, The site is marginally acceptable for the <br />system described above due to the marginal soil and/or <br />groundwater conditions which exist on the property. <br />Construction during the wet winter season may seriously <br />compromise the quality of the system. Make sure that soil <br />moisture conditions are acceptable before installing the <br />system. <br />THIS SYSTEM MUST BE INSPECTED AND APPROVED PRIOR TO BACKFILL <br />When work is complete and ready for inspection, call our <br />Automated Inspection Request line at 272-4427 to request an <br />inspection, Enter the number "801" for a PRE-COVER inspec- <br />tion. You may leave a message for the inspector if desired. <br />Be sure the System Record form with the As-Built drawing is <br />on the job or in our office when the inspection is requested <br />An inspection should be completed within seven (7) days. <br /> <br />99-01158 <br />ISSUED <br />04/08/1999 <br />04/07/2000 <br />2 <br /> <br /> <br />