My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BUILD - 1594483
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
99-XXXXX
>
BUILD - 1594483
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2010 2:54:42 PM
Creation date
2/15/2005 12:38:42 PM
Metadata
Fields
Template:
Permits
Permit Address
15180 PARK AV NE
Permit City
Aurora
Permit Number
555-99-01518
Parcel Number
041W13AC02800
Permit Type
BUILD
Permit Doc Type
Permit Document
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BUILDING PERMIT <br />DATE/TIME 02/16/99 16~14 <br />TYPE Residential accessory struct <br />OCCUPANCY U-1 <br />CONST TYPE V-N <br />UGB: SITE: FD FL <br /> <br />PERMIT NO <br />STATUS <br />ISSUED <br />TO EXPIRE <br />PAGE <br /> <br />99-01518 <br />ISSUED <br />03/16/1999 <br />09/12/1999 <br /> 2 <br /> <br />PLAN REVIEW COMMENTS AND CONDITIONS <br /> <br />REQUIRED SETBACKS: Front: Left: 5 Right: 5 Rear: 9 Special: <br /> MUST BE LOCATED IN REAR YARD <br /> <br /> 1. CALL BEFORE YOU DIG .... IT'S THE [AW. <br /> A~ENTION: Oregon law requires you to follow rules adopted <br /> by the Oregon Utility Notification Center, Those rules are <br /> set forth in OAR 952-001-0010 through OAR 952-001-0090, You <br /> may obtain copies of the rules by calling the center, <br /> (Note: The telephone number for the Oregon Utility Notifica- <br /> tion Center is (502) 222-1987), <br /> 2, THIS PLAN REVIEW WAS COMPLETED BY D. MARET ON 3-15-99, <br /> 2. Approval of submitted plans is not an approval of omissions <br /> or oversights by this office or of noncompliance with any <br /> applicable regulations of local government, <br /> 4, Approved for private non-commercial use only. <br /> 5. Must be located out of floodplain as shown on site plan, <br /> 6, THE FLOOD PLAIN APPROXIMATE BY THE FIRM #410154 010~ C <br /> INDICATES THE 100 YEAR FLOOD ELEVATION TO BE APPROXIMATELY <br /> 104 FEET ABOVE SEA [EVEL~ THE PROPOSED PLACEMENT OF THE <br /> BUILDING IS AT AN ELEVATION OF 108 FEET ABOVE MSL PER THE <br /> CITY OF AURORA, THE 108 ELEVATION AT SITE SHALL BE MEASURED <br /> TO THE OUTSIDE GRADE AND NOT TO THE INSIDE FLOOR ELEVATION. <br /> 7, BUILDINGS BELOW SLOPES shall be set a sufficient distance <br /> from the slope to provide protection from slope drainage, <br /> erosion, and shallow failures. [Sec. 401.6:1.1] <br /> 8. BELOW SLOPE SETBACKS, Unless specific permission is granted <br /> by the Building Official, buildings constructed below <br /> ascending slopes shall be setback a minimum of one half the <br /> height of the slope from the toe of the slope, except that <br /> the setback need not exceed 15 feet, [Figure 401.6] <br />9. POST, POLES AND COLUMNS, Posts. polles, and columns <br /> supporting permanent structures intended for human occupancy <br /> which are embedded in concrete in direct contact with the <br /> ground or embedded in conrete exposed to the weather shall <br /> be approved pressure treated wood suitable for ground <br /> contact use. (SEC, 222.1,3) <br />10. ALL ELECTRICAL WIRING EXPOSED TO POSSIBLE FLOODING SHALL BE <br /> ENTIRLY WITHIN A FLOOD PROOF SPACE. (SEC~ 302,3) <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.