GENERAL NOTES <br /> <br />1. ALL WORK SHALL CONFORM TO THE STANDARD SPECIFICATIONS AND <br /> THE REQUIREMENTS OF MARION COUNTY, AND THE LATEST EDITION <br /> OF THE UNIFORM BUILDING AND PLUMBING CODE. <br /> <br />THE WORKING DRAWINGS ARE GENERALLY DIAGRAMMATIC. THEY DO NOT <br />SHOW EVERY OFFSET, BEND OR ELBOW REQUIRED FOR INSTALLATION IN THE <br />SPACE PROV[DED. THEY DO NOT SHOW EVERY DIMENSION, COMPONENT <br />PIECE, SECTION, JOINT OR FITTING REQUIRED TO COMPLETE THE PROJECT. <br />ALL LOCATIONS FOR WORK SHALL BE CHECKED AND COORDINATED W[TH <br />EXISTING CONDITIONS IN THE RELD BEFORE BEGINNING CONSTRUCTION. <br />EXISTING UNDERGROUND UTILITIES LAYING WITHIN THE LIMITS OF EXCAVATION <br />SHALL BE VERIFIED AS TO CONDITION, SIZE AND LOCATION BY UNCOVERING, <br />PROVIDING SUCH IS PERMITTED BY LOCAL PUBI_[C AUTHORITIES WITH <br />JURISDICTION, BEFORE BEGINNING CONSTRUCTION. CONTRACTOR TO NOTIFY <br />ENGINEER IF THERE ARE ANY DISCREPANCIES. <br /> <br />EFFECTIVE EROSION CONTROL IS REQUIRED. EROSION CONTROL DEVICES <br /> MUST BE INSTALLED AND MAINTAINED TO MEET THE D.E.Q. REQUIREMENTS. <br /> <br />EFFECTIVE DRAINAGE CONTROL IS REQUIRED. .DRAINAGE SHALL BE <br />CONTROLLED WITHIN THE WORK SITE AND SHALL BE ROUTED SO THAT <br />ADJACENT PRIVATE PROPERTY, PUBLIC PROPERTY, AND THE RECEIVING <br />SYSTEM ARE NOT ADVERSELY IMPACTED. <br /> <br />CONTRACTOR SHALL ADJUST ALL STRUCTURES IMPACTED BY CONSTRUCT[ON <br />IMPROVEMENTS TO NEW FINISH GRADES. <br /> <br />EXCAVATION: EXCAVATE FOR SLABS, PAVING, AND OTHER IMPROVEMENTS TO <br />SIZES AND LEVELS SHOWN OR REQUIRED, ALLOW FOR FORM CLEARANCE AND <br />FOR PROPER COMPACTION OF REQUIRED BACKFILLING MATER]AL <br />EXCAVATOR(S) MUST COMPLY WITH O,R,S, 757,54-1 THROUGH 757,571; <br />EXCAVATOR(S) SHALL NOT]FY ALL UTILITY COMPANIES FOR L.[NE LOCATIONS <br />SEVENTY-TWO (72) HOURS (MINIMUM) PRIOR TO START OF WORK, DAMAGE TO <br />UTILITIES SHALL BE CORRECTED AT THE CONTRACTOR'S EXPENSE. <br /> <br />WHERE CONNECTING TO AN EXISTING PIPE, THE CONTRACTOR SHALL EXPOSE <br />THE END OF THE EXISTING PIPE VERIFY THE LOCATION, SIZE, AND ELEVATION. <br />NOTIFY ENGINEER OF ANY DISCREPANCIES. <br /> <br /> 8. CONTRACTOR SHALL VERIFY EXISTING SEWER PRIOR TO CONSTRUCTION OR OR ORDERING OF MATERIALS. NOTIFY ENGINEER OF INVERT ELEVATIONS PRIOR <br /> TO COMMENCING WORK. <br /> 9. THE SANITARY SEWER LINE HAS BEEN DESIGNED TO MATCH THE PUBLIC SEWER <br /> PREPARED BY BOATWR[GHT ENGINEERING. <br /> <br />10. PROVIDE CLEANOUTS AS REQUIRED IN THE CURRENT UNIFORM PLUMBING CODE <br /> CHAPTER 7, SECTIONS 707 AND 719, AND CHAPTER 11, SECTION 1105.04. <br /> NOTE: NOT ALL REQUIRED CLEANOUTS ARE SHOWN ON THE PLANS. <br /> <br />11. THE SURVEY INFORMATION SHOWN AS A BACKGROUND SCREEN ON THIS SHEET <br /> IS BASED ON A SURVEY PREPARED BY HICKMAN & ASSOCIATES, DATED 7/23J98. <br /> <br />12. CONTRACTOR SHALL COORDINATE CONSTRUCTION WiTH FACILITIES MANAGER <br /> FACILITIES SHALL MAINTAIN OPERATIONAL AT ALL TIMES <br /> <br />13. SANITARY SEWER TRENCH SHALL BE BACKFIU_ED WiTH 1'-0 COMPACTED CRUSHED <br />14.. ~CONTRACTOR SHALL REPLACE ANY CURB, CONCRETE, STRIPING OR LAN <br /> DISTURBED DURING CONSTRUCTION. <br /> <br /> <br />