Laserfiche WebLink
~ <br />~ ~~ ~~ <br />9~8~99 Courthouse Square <br />Approved COR / CO Log <br /> APPROVED COUNTY TRANSIT <br />COR CO AMOUNT DESCRIPTION OF CHANGE A LLOCATION ALLOCATION <br />COR # 1 1 $ 2,530.00 Decomission, removal and disposal of UST encountered on 3-15-99 $ 2,530 $ - <br />COR # 2 1 $ 1,765.00 Resolve gas line conflicts during sewer line relocation $ 1,224 $ 541 <br />COR # 3 5 $ 14,135.00 Excavate, remove and dispose of three tanks in the NW corner of the site $ 14,135 $ - <br />COR # 4 1 $ 12,215.00 Removal and disposal of contaminated soils-203.9 c.y. $ 12,215 $ - <br />COR # 5 1 $ 4,982.00 Decomission, removal and disposal of UST encountered along s. blockface $ 4,982 $ - <br />COR # 6 1 $ 3,450.00 Increase compressive strength of footing pads from 3,000 to 5,000 psi $ 2,393 $ 1,057 <br />COR # 7 5 $ 6,966.00 Additional dewatering costs due to overexcavation $ 4,832 $ 2,134 <br />COR # 8 5 $ 1,876.00 Owner's share of partnering session $ 938 $ 938 <br />COR # 9 2 $ 16,112.00 Removal and disposal of contaminated soils-268.54 c.y. $ 16,112 $ - <br />COR # 10 5 $ 1,394.00 Provide cavity wall insulation at exterior masonry walls of rooms 1209, 1219 and 1239 $ 967 $ 427 <br />COR # 11 <br />COR # 12 2 $ 685.00 Demolition of water vault along Court street $ 475 $ 210 <br />COR # 13 5 $ (700.00) Delete sump pump at elevator #1 $ (486) $ (214) <br />COR # 1 <br />COR 9,~ $ - $ - $ - <br />COR # 16 <br />COR # 17 2 $ 41,470.00 Removal and disposal of contaminated soils $ 41,470 $ - <br />COR # 18 5 $ (18,723.00) VE proposal #1-Delete low "E" coating on #3 surface of bus mall glass canopy system $ (12,986) $ (5,737) <br />COR # 19 5 $ (1,744.00) VE proposal #1-Replace 1600 amp bus duct with conduit and wire for feed to rooftop equip. $ (1,210) $ (534) <br />COR # 20 3 $ 214,993.00 * Excavation of unsuitable subgrade/fill in areas of unsuitable or contaminated soils $ 159,414 $ 55,579 <br />COR # 21 4 $ 27,697.00 Removal and disposal of contaminated soils-461.62 c.y. $ 27,697 $ - <br />COR # 22 5 $ 5,193.00 Provide couplers at top of parking level columns for future north pad development $ 3;602 $ 1,591 <br />COR # 23 5 $ (440.00) Delete PT tendon locators $ (305) $ (135) <br />COR # 24 8 $ 5,292.00 Slab transition revisions ~~...~~+~...+~9.. C.lL,,....-~ .-~ .~,Q....s.~..~„ ~,.~ $ 3,671 $ 1,621 <br />C O R# 25 S t p.b cj~ p Gc.,d,,.._ ,.~ ~Q „7~,,,. ~a,~s~ <br />0. <br />~~ <br />COR # 26 5 $ 993.00 u <br />Revise column ties after fabrication $ 689 $ 304 <br />COR # 27 5 $ 538.00 Provide column tail revisions $ 373 $ 165 <br />COR # 28 6 $ 32,437.00 Provide six paraliel parking stalls w/ covered walkway -relocate future job trailers to Church $ 22,498 $ 9,939 <br />COR # 29 5 $ 9,534.00 Revise column reinforcement detail $ 6,613 $ 2,921 <br />COR # 30 5 $ 2,775.00 Provide added rebar at isolation joints $ 1,925 $ 850 <br />6~9~-#~34- 9 <br />^ $ - $ - <br />COR # 32 <br />COR # 33 5 $ (1,081.00) Delete link seal and ESP-1 $ (750) $ (331) <br />COR # 34 9 $ 1,607.00 Add (4) hot water hose bibs per PR #8 $ 1,115 $ 492 <br />~~~5, M1-~.:.~t ~..+~ '~"' ~ir ~(~.~-~-ras~-~ a.- v'~'S-T- s_~ <br />