Laserfiche WebLink
9/13/99 <br />COR <br />COR #11 <br />COR #14 <br />COR #31 <br />COR #32 <br />COR #40 <br />COR #41 <br />COR #43 <br />COR #46 <br />COR #49 <br />COR #52 <br />COR #58 <br />COR #60 <br />COR #74 <br />COR #77 <br />COR #80 <br />COR #81 <br />PROPOSED AMOUNT <br />$265.00 <br />$2,231.00 <br />$0.00 <br />$4,608.00 <br />$0.00 <br />$6,080.00 <br />$8,910.00 <br />($19,149.00) <br />$7,278.00 <br />$3,973.00 <br />$1,407.00 <br />$5,172.00 <br />$4,505.00 <br />$0.00 <br />$2,061.00 <br />$4,607.00 <br />$31,948.00 <br />Courthouse Square <br />Pending COR's <br />DESCRIPTION OF CHANGE STATUS <br />Door revisions per PR #2 Pending Resolution <br />Revisions per PR #1 Pending Resolution <br />Revisions per PR # 4 Pending Review <br />Water service revisions per PR #5 Pending Resolution <br />Change fire rating per PR #10 Pending Resolution <br />Provide headers at basement level 3hr doors Pending Resolution <br />Add duct bank beam and column Pending Resolution <br />Delete underslab waterproofing per PR #6 Pending Resolution <br />Provide insulation wrap at rebar and durometer at CMU walls Pending Review <br />Dewatering during overexcavation (west) Pending Resolution <br />Move gas pressure regulators per PR #21 Pending Review <br />Provide control revisions per RFI 253 Pending Review <br />Rebar revisions at stairwells per RFI #246 Pending Resolution <br />Delete beam above elevator per PR #34 Pending Resolution <br />Provide increased plate sizes per RFI 318 Pending Review <br />Provide concrete ceiling above switch gear/CMU revisions per RFI 193 Pending Review <br />Pending COR Subtotal <br />