Laserfiche WebLink
COR # 3~ 5 $ 074.U0 <br />6 Re~rise co[umns to go to roof level a1 grids 0/11 and O/12 $ 4,213 $ 1,861 <br />COR # 36 5 $ , <br />(2,547_QO) Rev[se ca[umn type a1 grid J-10a $ <br />$ (i,767) <br />735 <br />2'1 $ <br />$ (780) <br />60'1 <br />9 <br />COR # 37 9 $ 31,336.a0 Provide sump pit per PR #9 $ , <br />548 $ , <br />242 <br />COR # 39 5 $ 79d.00 Provide reinforcing at SOG beneath calumns $ 42A <br />1 $ 629 <br />COR # 39 5 $ 2,053.00 Pravide added loating and calumn , <br />COR # 4U <br />GO R # 41 <br />COR # 42 <br />5 <br />$ <br />(8,962.00) <br />VE proposal #3-Revise precast panels to miiered corners instead ot "U" shape <br />$ <br />(6,216) <br />$ <br />(2,746) <br />COR # 43 <br />~ <br />" <br />~ _ <br />COR # 44 5 $ - P-ovide flourescent lamp revisions <br />5~ ~~`'~ '~a~'$ _ $ - <br />COR #45 5 $ - Provide hol~ow metal frame revisions <br />a ~ <br />~ <br />i $ 395) <br />(14 $ (6,361) <br />GOR # 46 11 S (20,759.00) ~ ~~ <br />n same are <br />Delele benEonitewaterproofing and reduce slab thickness , <br />66g $ 295 <br />COR # 47 5 $ 963.00 Provide tfoor hardene~ at roams 1209, 12'19, and '1239 $ <br />$ 73 $ ~2 <br />GOR # 48 5 $ 105A0 Change wall mo~nted water closet to floor mounted waler clvset in raom 1224 <br />GOR # 49 t'[ $ 278.00 <br />7 ProvEde insulation at rebar dowels and durometer beanng pad per RFI's 199 and 204 ~ 5,048 $ 2,230 <br />GOR #60 5 $ , <br />315.00 Remove and dispose of UST adjacent to Church Street <br />il <br />d $ <br />$ 315 <br />965 <br />67 $ <br />$ - <br />861 <br />22 <br />COR #51 7 $ 846.00 <br />90 so <br />s <br />~'` Eaccavation of unsuilable subgradelfill in areas o1 unsuitable or contaminate , , <br />Cpi~ #~2 11 $ , <br />934.00 <br />2 Provfde dewatering for ur~documented fill areas ho~n 5121/99 to 6I20199 ~ $ 2,035 $ 899 <br />CoR #53 5 $ , <br />3,1 fl6.00 Revise foundation drain pipe specif~cation $ 2,21U <br />839 $ <br />$ 976 <br />371 <br />COR #~4 5 $ 1,210.00 Provide added rebar for pilaster a1 the SW airshaR $ <br />$ 334 <br />16 $ 216 <br />7 <br />COR #55 8 $ 23,550.00 Upgrade windows to Sungate 1000 allhree building taces ~ , <br />(5a) ~ , <br />(2$) <br />COR #56 5 $ (83.00) Provide changes to glazing ~ 1 <br />088 S 481 <br />COR #57 8 $ 1,569.00 Change colutnn in hearing room <br />~' <br />~ ~0~~ $ , <br />976 $ 4~7 <br />COR #~6 11 $ 1,407.00 0 <br />Provide changes to gas pressu~e regulators er P~ R~~ ~ <br />~'~ ~~~~_ $ ~~9 $ 252 <br />COR #b9 8 $ 82'I.00 Added column ties <br />~ <br />COR #60 <br />COR #61 8 $ 2,107.00 Added rebar an GF1 per shop drawings $ 1,461 ~ 646 <br />232 <br />CoR ~62 B $ 758.00 Lu~rtinar base at flagpole $ <br />$ 526 <br />~ <br />6~ $ <br />$ 708 <br />COR #S3 8 $ 2,310A0 3tand pFpe changes per PR #3 $ ~ <br />214 <br />28 $ 12,464 <br />COR #64 B $ 4U,678.00 Added rebar at pour strips <br />' $ , <br />497) <br />(2 $ (1,103) <br />COR #~5 8 $ sand layer <br />(3,BOfl.00) Delete 2 $ , <br />144 $ 64 <br />COR#fi6 8 $ 208.00 Added sieel bracing at canopy $ 412 <br />6 $ 2,833 <br />GOR #67 B $ 9,24~.00 Change door frames per PR #31 ~ , <br />~84 $ ~69 <br />COR #68 8 $ 553_00 Owner's job shac~c pF~ane ~ BO $ 36 <br />COR ;A~69 8 $ 116.00 Provide dowels ai east sta[rwel! ~ 257 $ 114 <br />GOR #7U A $ 371.00 Provide thickened generator sfab S 527 <br />1 $ 674 <br />GOR #71 8 $ 2,20'f.00 ~rovide changes to air in#ake ~ , <br />3'~8) <br />(3 $ - <br />COR #72 8 $ {3,31B.fl0) ~1TE credit on removal of three tanks , <br />