COR # 3~ 5 $ 074.U0
<br />6 Re~rise co[umns to go to roof level a1 grids 0/11 and O/12 $ 4,213 $ 1,861
<br />COR # 36 5 $ ,
<br />(2,547_QO) Rev[se ca[umn type a1 grid J-10a $
<br />$ (i,767)
<br />735
<br />2'1 $
<br />$ (780)
<br />60'1
<br />9
<br />COR # 37 9 $ 31,336.a0 Provide sump pit per PR #9 $ ,
<br />548 $ ,
<br />242
<br />COR # 39 5 $ 79d.00 Provide reinforcing at SOG beneath calumns $ 42A
<br />1 $ 629
<br />COR # 39 5 $ 2,053.00 Pravide added loating and calumn ,
<br />COR # 4U
<br />GO R # 41
<br />COR # 42
<br />5
<br />$
<br />(8,962.00)
<br />VE proposal #3-Revise precast panels to miiered corners instead ot "U" shape
<br />$
<br />(6,216)
<br />$
<br />(2,746)
<br />COR # 43
<br />~
<br />"
<br />~ _
<br />COR # 44 5 $ - P-ovide flourescent lamp revisions
<br />5~ ~~`'~ '~a~'$ _ $ -
<br />COR #45 5 $ - Provide hol~ow metal frame revisions
<br />a ~
<br />~
<br />i $ 395)
<br />(14 $ (6,361)
<br />GOR # 46 11 S (20,759.00) ~ ~~
<br />n same are
<br />Delele benEonitewaterproofing and reduce slab thickness ,
<br />66g $ 295
<br />COR # 47 5 $ 963.00 Provide tfoor hardene~ at roams 1209, 12'19, and '1239 $
<br />$ 73 $ ~2
<br />GOR # 48 5 $ 105A0 Change wall mo~nted water closet to floor mounted waler clvset in raom 1224
<br />GOR # 49 t'[ $ 278.00
<br />7 ProvEde insulation at rebar dowels and durometer beanng pad per RFI's 199 and 204 ~ 5,048 $ 2,230
<br />GOR #60 5 $ ,
<br />315.00 Remove and dispose of UST adjacent to Church Street
<br />il
<br />d $
<br />$ 315
<br />965
<br />67 $
<br />$ -
<br />861
<br />22
<br />COR #51 7 $ 846.00
<br />90 so
<br />s
<br />~'` Eaccavation of unsuilable subgradelfill in areas o1 unsuitable or contaminate , ,
<br />Cpi~ #~2 11 $ ,
<br />934.00
<br />2 Provfde dewatering for ur~documented fill areas ho~n 5121/99 to 6I20199 ~ $ 2,035 $ 899
<br />CoR #53 5 $ ,
<br />3,1 fl6.00 Revise foundation drain pipe specif~cation $ 2,21U
<br />839 $
<br />$ 976
<br />371
<br />COR #~4 5 $ 1,210.00 Provide added rebar for pilaster a1 the SW airshaR $
<br />$ 334
<br />16 $ 216
<br />7
<br />COR #55 8 $ 23,550.00 Upgrade windows to Sungate 1000 allhree building taces ~ ,
<br />(5a) ~ ,
<br />(2$)
<br />COR #56 5 $ (83.00) Provide changes to glazing ~ 1
<br />088 S 481
<br />COR #57 8 $ 1,569.00 Change colutnn in hearing room
<br />~'
<br />~ ~0~~ $ ,
<br />976 $ 4~7
<br />COR #~6 11 $ 1,407.00 0
<br />Provide changes to gas pressu~e regulators er P~ R~~ ~
<br />~'~ ~~~~_ $ ~~9 $ 252
<br />COR #b9 8 $ 82'I.00 Added column ties
<br />~
<br />COR #60
<br />COR #61 8 $ 2,107.00 Added rebar an GF1 per shop drawings $ 1,461 ~ 646
<br />232
<br />CoR ~62 B $ 758.00 Lu~rtinar base at flagpole $
<br />$ 526
<br />~
<br />6~ $
<br />$ 708
<br />COR #S3 8 $ 2,310A0 3tand pFpe changes per PR #3 $ ~
<br />214
<br />28 $ 12,464
<br />COR #64 B $ 4U,678.00 Added rebar at pour strips
<br />' $ ,
<br />497)
<br />(2 $ (1,103)
<br />COR #~5 8 $ sand layer
<br />(3,BOfl.00) Delete 2 $ ,
<br />144 $ 64
<br />COR#fi6 8 $ 208.00 Added sieel bracing at canopy $ 412
<br />6 $ 2,833
<br />GOR #67 B $ 9,24~.00 Change door frames per PR #31 ~ ,
<br />~84 $ ~69
<br />COR #68 8 $ 553_00 Owner's job shac~c pF~ane ~ BO $ 36
<br />COR ;A~69 8 $ 116.00 Provide dowels ai east sta[rwel! ~ 257 $ 114
<br />GOR #7U A $ 371.00 Provide thickened generator sfab S 527
<br />1 $ 674
<br />GOR #71 8 $ 2,20'f.00 ~rovide changes to air in#ake ~ ,
<br />3'~8)
<br />(3 $ -
<br />COR #72 8 $ {3,31B.fl0) ~1TE credit on removal of three tanks ,
<br />
|