Laserfiche WebLink
~ <br />0 <br /> 0 <br /> 00 <br />~ <br />m <br /> <br />~ora~9s <br />Courthouse Square m <br /> <br />Pending COR's ~ <br />~° <br /> ~ <br />~ <br />COR PROPOSED AMOUNT DESCRIPTION OF CHANGE STATUS <br />Pending Resolution ;~ <br />~ <br />COR #11 <br />GOR #41 $265.00 <br />080.00 <br />$6 Door revisions per PR ~f2 <br />Provide headers a1 basement le~el 3hr doors Pe~ding Resolution ~ <br />C4R ~t43 , <br />9'10.00 <br />$8 Add duct bank beam and column Pending Resolution ~, <br /> <br />COR #74 , <br />505.00 <br />$4 <br />Rebar revisions at stairwe[Is per RFI #246 Pending Resoluiion <br />W <br />COR i~80 , <br />~61.00 <br />$2 Prov3de increased plate sizes per RFI 318 Pending Review ~ <br />~ <br />COR #85 , <br />686.00 <br />$4 Provide additional c~n~uit for swing gaRer ope~alor per submitial 02710-001 Pending Review <br />COR #8B , <br />354.00 <br />$12 Provide c}~anges to door hardware per PR #24 Pending Review ~ <br />COR ~€90 , <br />006.00 <br />$~3 Provide tube steel col~mns @ elv#3 per RFI's 1A3, 311, 321 Pending Resolution ~ <br />COR ~92 , <br />Pricing To Be Reviseri Provlde slab over elevator f~oistway per RFI`s 247 & 248 Pricing To Be Revised <br />COR #97 Pricing To Be Revised Provide revisior~s to the traffic signalizalion plan per PR ~k11 Pricfng To Be Revised <br />COR #104 Pricing To Be Revised Provide ceiling above trash room per RF1329 Pricing To Be Revised <br />COR #105 853.00 <br />$60 Provide and instaH s~ace saver Tiling syslem per PR #41 Pending Review <br />COR #106 , <br />$784.00 Provide additional reaar at GF per RFI 314-PT ca~le already on site Pending Resolution ~ <br />COR #107 $475.00 Provide addi#ional PT cables and reinforci~g adjustments at ramp Pending Review ~ <br />COR #108 $859.00 Provide changes lo luminar+es and electrical oonnections per PR ~18r Pending Review z <br />COR #1'f 0 $7,192.00 Provide additional reinforeing on flrs 3-5 per strvctural shop drawing review Pending Review ~ <br />COR ~1'i5" $3,532,00 Provide added PT cables at GF pour jeinls per revised shop drawings Pending Review ~ <br /> ____-_=_-________- <br />s145,562.00 <br />Pending GOR Sublatal o <br />~ <br />~ <br /> <br />' COR #1 ~5 includes a delay caaim ot 8 working days caused by changes in COR's 115 and 64 z <br />~ <br /> ~ <br />~ <br />0 <br />0 <br />~ <br />