COR #73 8 $ 5,269.00 Provide changes to column base ~'~`~ LO~'" r~~~T w~.~• <br />~~~ S~~ ~ ~~ ~ $ 3,655 $ 1,614 <br />COR #74 <br />COR #75 ,9~ $ (17.00) Provide revisions to electrical drawings per PR #16 <br />M~ <br />~""`9" <br />~ ~ $ (12) <br />7 <br />8 $ (5) <br />3 <br />419 <br />COR #76 9 $ 157.00 <br />11 -- <br />' <br />Provide changes to air at rooms per PR #27- A~tQ-~• <br />-~ <br />~ $ 3 <br />7, $ , <br />COR #77 _ , - or- <br />.~-`~'' cs.~'" ~Q~--~^"'~ 6~"" a o~+ <br />~ <br />~" <br />' 669 $ 295 <br />CO 78 ~ $ 964 00 ' ~ <br />' <br />R <br />Added dowels and shear head a $ <br />COR # 9 10 $ 82,520.00 Removal and disposal of unsuitable subgrade material $ 57,236 $ 25,284 <br />COR #80 ~ ~ <br />r <br />COR #81 00 <br />726 , r'~"'~ <br />Provide two additional 4" conduit sieeves in Data/Com room per PR # 29 ~,~,~~ $ 504 $ 222 <br />COR #82 <br />COR #83 9 <br />9 $ <br />$ . <br />677.00 Provide two additional 1" conduits with pull cords per PR # 28, c.c,~~ .,.~f~ ~-- -~'^'$ 47~ $ 207 <br />COR #84 9 <br /> <br />- $ 8,960.00 Provide 273 3" conduit sleeves per EC proposal alternate # 32 $ <br />---- <br />---- 6,215 <br />--------- <br />--------- $ <br />---- <br />---- 2,745 <br />--------- <br />--------- <br /> $ 699,062.00 Total Committed-Construction Change Orders $ 535,340 $ 163,722 <br />Original Project Contingency-Marion County $ 1,976,696 <br />Minus Change Orders (Excludes Remediation-Related CO's) $(380,249) <br />----------------- <br />Total Remaining Project Contingency $ 1,596,447 <br />Original Remediation Contingency-Marion County $ 300,000 <br />Minus Change Orders Related to Soils Remediation $(155,091) <br />----------------- <br />Total Remaining Remediation Contingency $ 144,909 <br />'$33,600 of COR #20 is a County only cost as it is related to the backfilling of areas that were environmentally impacted. <br />`$16,170 of COR #51 is a County only cost as it is related to the backfilling of areas that were environmentally impacted. <br />Total approved (County) COR's as a percent of total (County) project contingency 23.51 % <br />Total approved COR's as a percent of contractor bid (County and Transit) 3.79% <br />