Laserfiche WebLink
SECTION 01200 <br />PROJECT MEETINGS <br />------------------------------------------------------------- <br />EDIT TO SUIT PROJECT AND LOCATION. <br />UNDER THE FOLLOWING HEADINGS, INSERT APPLICABLE STATEMENTS. <br />------------------------------------------------------------- <br />PART 1 GENERAT• <br />CONSTRUCTION WASTE MANAGEMENT MEETINGS <br />A. contractor shall either conduct separate <br />construction waste management meetinga or diecuss <br />waste management goals and issues as part of the <br />following regular meetings: <br />[LIST REQUIRED TYPES AND NUMBERS OF MEETINGS AND <br />ATTENDEES. SPECIFY WHICH MEETINGS ARE MANDATORY <br />AND WHICH ARE CONTRACTOR'S OPTION. MAKING WASTE <br />MANAGEMENT PART OF REGULAR MEETINGS WILL BE MORE <br />COST EFFECTIVE. EDIT LIST BELOW TO SUIT PROJECT.] <br />1. Pre-bid meeting. <br />2. Pre-construction meeting. <br />3. Pre-fabrication meeting. <br />4. Regular job-site meetings. <br />5. Job safety meetings. <br />6. Special Conetruction Waste Management meetings. <br />B. Pre-sid Meeting: The Owner requires, as part of <br />the pre-bid meeting with all interested bidders <br />prior to the Bid Date, a discussion of waste <br />management goals established for the Project as <br />outlined in section 01505 - Construction Waste <br />Management. <br />C. Pre-Construction Meeting: Contractor shall include <br />discussions on waste management requirements per <br />section 01505-Construction Waste Management in the <br />pre-construction meeting. <br />D. Pre-Fabrication Meeting: Contractor shall include <br />discussions on waste management goals and <br />requirements per Section 01505 - Construction <br />waste Management in all pre-fabrication meetinga <br />conducted with subcontractors or fabricators. <br />E. Regular ,7ob Meetings: Contractor shall include <br />