My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specs: Water Spec/ Supplementary
>
CS_Courthouse Square
>
Bid Specs: Water Spec/ Supplementary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:23:02 AM
Creation date
8/1/2011 11:58:56 AM
Metadata
Fields
Template:
Building
RecordID
10053
Title
Bid Specs: Water Spec/ Supplementary
Company
Arbuckle/Costic
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Procurement
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 01200 <br />PROJECT MEETINGS <br />------------------------------------------------------------- <br />EDIT TO SUIT PROJECT AND LOCATION. <br />UNDER THE FOLLOWING HEADINGS, INSERT APPLICABLE STATEMENTS. <br />------------------------------------------------------------- <br />PART 1 GENERAT• <br />CONSTRUCTION WASTE MANAGEMENT MEETINGS <br />A. contractor shall either conduct separate <br />construction waste management meetinga or diecuss <br />waste management goals and issues as part of the <br />following regular meetings: <br />[LIST REQUIRED TYPES AND NUMBERS OF MEETINGS AND <br />ATTENDEES. SPECIFY WHICH MEETINGS ARE MANDATORY <br />AND WHICH ARE CONTRACTOR'S OPTION. MAKING WASTE <br />MANAGEMENT PART OF REGULAR MEETINGS WILL BE MORE <br />COST EFFECTIVE. EDIT LIST BELOW TO SUIT PROJECT.] <br />1. Pre-bid meeting. <br />2. Pre-construction meeting. <br />3. Pre-fabrication meeting. <br />4. Regular job-site meetings. <br />5. Job safety meetings. <br />6. Special Conetruction Waste Management meetings. <br />B. Pre-sid Meeting: The Owner requires, as part of <br />the pre-bid meeting with all interested bidders <br />prior to the Bid Date, a discussion of waste <br />management goals established for the Project as <br />outlined in section 01505 - Construction Waste <br />Management. <br />C. Pre-Construction Meeting: Contractor shall include <br />discussions on waste management requirements per <br />section 01505-Construction Waste Management in the <br />pre-construction meeting. <br />D. Pre-Fabrication Meeting: Contractor shall include <br />discussions on waste management goals and <br />requirements per Section 01505 - Construction <br />waste Management in all pre-fabrication meetinga <br />conducted with subcontractors or fabricators. <br />E. Regular ,7ob Meetings: Contractor shall include <br />
The URL can be used to link to this page
Your browser does not support the video tag.