My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specs: Water Spec/ Supplementary
>
CS_Courthouse Square
>
Bid Specs: Water Spec/ Supplementary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:23:02 AM
Creation date
8/1/2011 11:58:56 AM
Metadata
Fields
Template:
Building
RecordID
10053
Title
Bid Specs: Water Spec/ Supplementary
Company
Arbuckle/Costic
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Procurement
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 01400 <br />QUALITY CONTROL <br />------------------------------------------------------------- <br />THE CONTRACTOR'S OBSERVANCE DURING CON5TRUCTION OF THE QUALITY CONTROL <br />PROVISIONS TYPICAI,LY INCLUDED IN MOST SPECIFICATIONS IS ONE OF THE MOST <br />EFFECTIVE WASTE REDUCTION STRATEGIES. SUCH PROVISIONS REDUCE DAMAGE TO <br />MATERIALS~ PRODUCTS~ AND INSTALLATIONS DUE TO MISHANDLING~ <br />MISAPPLICATION, AND IMPROPER STORAGE AND/OR PROTECTION. SEVERAL <br />EXAMPLES OF TYPICAL QUALITY CONTROL PROVISIONS THAT REDUCE ON-SITE WASTE <br />FOLLOW. <br />EDIT TO SUIT PROJECT AND LOCATION. <br />UNDER THE FOLLOWING HEADINGS, INSERT APPLICABLE STATEMENTS. <br />------------------------------------------------------------- <br />PART 1 GENERAT• <br />PROJECT / SITE CONDITIONS <br />p,. Field Measurements: Contractor is to verify that <br />field measurements are as indicated on construction <br />and/or shop drawings before confirming product <br />orders or proceeding with work, in order to <br />minimize waste due to excessive materials. <br />PACKING AND SHIPPING <br />A. shipping: Coordinate the schedule of product <br />delivery to designated prepared areas in order to <br />minimize site storage time and potential damage <br />to stored materials. <br />B. Packing: Arrange for the return of packing <br />materials, such as wood pallets, where economically <br />feasible. <br />PART 2 PRODUCTS Not Used. <br />PART 3 EXECUTION <br />PREPARATION <br />A. Storage and Protection: Deaignate <br />receiving/storage areas for incoming material to be <br />delivered according to installation schedule and to <br />be placed convenient to work area in order to <br />minimize waste due to excessive materials handling <br />and misapplication. <br />B. store and handle materials in a manner as to <br />
The URL can be used to link to this page
Your browser does not support the video tag.