My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specs: Water Spec/ Supplementary
>
CS_Courthouse Square
>
Bid Specs: Water Spec/ Supplementary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:23:02 AM
Creation date
8/1/2011 11:58:56 AM
Metadata
Fields
Template:
Building
RecordID
10053
Title
Bid Specs: Water Spec/ Supplementary
Company
Arbuckle/Costic
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Procurement
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 01500 <br />CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS <br />------------------------------------------------------------- <br />EDIT TO SUIT PROJECT AND LOCATION. <br />UNDER THE FOLLOWING HEADINGS, INSERT APPLICABLE STATEMENTS. <br />------------------------------------------------------------- <br />PART 1 GENERAT• <br />TEMPORARY POWER <br />[THIS IS AN APPROPRIATE LOCATION FOR LANGUAGE <br />PERTAINING TO ADDITIONAL ENVIRONMENTAL ISSUES BEYOND <br />THE SCOPE OF THIS WASTESPEC~ SUCH AS REQUIRING ENERGY <br />MANAGEMENT CONTROLS DURING CONSTRUCTION TO CONSERVE <br />POWER.] <br />NOISE, DUST, AND POLLUTION CONTROL <br />A. Refer to section 01505 - Construction Waste <br />Management. In addition, comply with Owner~s and <br />local requiremente for noise, dust, and pollution <br />control. <br />BARRIERS AND ENCLOSURES <br />A. Materials: Reuse Project construction waste <br />materials, or provide materials for barriers and <br />enclosures which are nonhazardous, recyclable, <br />or reusable to the maximum extent possible. <br />1. Barricades and Enclosures: Provide enclosures <br />around pilea of aeparated materials pursuant to <br />the Waste Management Plan described in Section <br />01505 - Construction Waste Management. <br />2. Locate enclosures out of the way of <br />construction traffic. Provide adequate space <br />for pick-up and delivery and convenience to <br />subcontractors. <br />CLEANING <br />A. Control accumulation of waste materials and trash. <br />Recycle or dispose of off-site at intervals <br />approved by the owner and in compliance <br />with waste management procedures specified in <br />Section 01505. <br />B. Cleaning materials: Use cleaning materials that <br />are nonhazardous. <br />
The URL can be used to link to this page
Your browser does not support the video tag.