Laserfiche WebLink
FOR RESOURCES.J <br />E. Maintain an inventory of all removed materials and <br />submit tracking forms for all removed materials indicating <br />type, quantities, condition, destination, and end use. <br />RELATED SECTIONS <br />A. Section 02200 Earthwork. <br />02060 BUILDING DEMOLITION <br />[USE THIS SECTION FOR WHOLE BUILDING DISMANTLING~ RECYCLING, <br />SALVAGE, AND REUSE. COORDINATE CLOSELY WITH DRAWINGS. USE THE <br />PROVISIONS LISTED UNDER SECTION 02050 DEMOLITION AS APPROPRIATE.] <br />02070 SELECTIVE DEMOLITION <br />[IISE THIS SECTION FOR PARTIAL OR MINOR DISMANTLING, RECYCLING, <br />SALVAGE, AND REUSE. WHEN WASTE REDUCTION IS A PRIORITY, USE OF <br />THIS SECTION TO SPECIFY DEMOLITION WORK MAY HELP TO EMPHASIZE <br />WASTE REDUCTION OBJECTIVES. COORDINATE CLOSELY WITH DRAWINGS. <br />USE THE PROVISIONS LISTED UNDER SECTION 02050 - DEMOLITION AS <br />APPROPRIATE.] <br />A. Execute dismantling and salvage operations ao as to <br />minimize the risk of damage to the immediate environment. <br />RELATED SECTIONS <br />A. section 01045 Cutting and Patching. <br />02110 SITE CLEARING <br />A. Protect trees and other designated features and areas <br />by erecting a high visibility construction fence, a minimum <br />of 3• high. Locate fence no closer to trees than the drip <br />line. <br />s. All marketable trees designated for removal are to be <br />sold. All other vegetation is to be ground, chipped, or <br />shredded for mulching and composting, or where these options <br />are not possible, for use as mill pulp or process fuel. <br />c. Provide on-site locations for as much excavated rock, <br />soil, and vegetation as poasible. Provide erosion control <br />and seeding if not immediately used. <br />D. Separate organic and inorganic material. [EDIT TO <br />SUIT PROJECT.) <br />E. stockpile topsoil for final grading and landscaping. <br />Provide erosion control and seeding if not immediately used. <br />02500 PAVING AND SURFACING <br />