My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specs: Water Spec/ Supplementary
>
CS_Courthouse Square
>
Bid Specs: Water Spec/ Supplementary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:23:02 AM
Creation date
8/1/2011 11:58:56 AM
Metadata
Fields
Template:
Building
RecordID
10053
Title
Bid Specs: Water Spec/ Supplementary
Company
Arbuckle/Costic
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Procurement
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CEMENT CONTENT IN A CONCRETE MIX. FOR STANDARDS REFER TO ASTM C <br />618-91.] <br />[OR INSERT PROVISIONS UNDER MANUFACTURERS/PRODUCTS.] <br />PART 3 EXECUTION <br />WASTE MANAGEMENT <br />A. separate and recycle waste materials in accordance <br />with the waste Management Plan and to the maximum extent <br />economically feasible. <br />B. Place materials defined as hazardous or toxic waste in <br />designated containers. <br />C. Uae trigger operated spray nozzles for water hoses. <br />E. Use the least toxic sealants, adhesives, sealers, and <br />finishes necessary to comply with the requirements of this <br />section. <br />SPECIFIC SECTIONS <br />[INSERT THE FOLLOWING ADDITIONAL PROVISIONS UNDER PART 3 <br />EXECUTION, WASTE MANAGEMENT~ UNLESS OTHERWISE NOTED.] <br />03300 CAST-IN-PLACE CONCRETE <br />A. Use reusable forms to the maximum extent economically <br />feasible. Clean all forms immediately after removal. <br />B. Incorporate crushed concrete or masonry materials in <br />sub-base to the maximum extent economically feasible in <br />accordance with sub-base specifications. <br />c. Before concrete pours, designate locations or uses for <br />excess concrete. Options include: [EDIT THE FOLLOWING TO <br />su2T PROJECT:] additional paving, post footing anchorage, <br />swale rip-rap reinforcing, mud slab, flowable fill, footing <br />bottom, retaining wall footing ballast, storm atructure <br />covers, underground utility pipe kickers, atorm pipe flared <br />end section, toe wash protection, and shoulder and toe <br />outfall restraints for temporary erosion pipes. <br />E. Before concrete pours, designate a location for <br />cleaning out concrete trucks. optione include: <br />1. company owned site for that purpose (meeting <br />environmental standards). <br />2. Remote on-site area to be paved later in project. <br />F. carefully coordinate the specified concrete work with <br />weather conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.