Laserfiche WebLink
PART 3 EXECUTION <br />WASTE MANAGEMENT <br />A. Separate and recycle waste materials in accordance <br />with the Waste Management Plan and to the maximum extent <br />economically feasible. <br />B. Place materials defined as hazardous or toxic waste in <br />designated containers. <br />C. use trigger operated spray nozz]:es for water hoses. <br />D. Fold up metal banding, flatten, and place in <br />designated area for recycling. <br />E. Collect wood packing shims and pallets and place in <br />designated area. <br />F. Place unuaed mixed mortar in designated locationa <br />where lower strength mortar meets the requirements for bulk <br />fill, for example, uae as retaining wall footing ballast, <br />cavity fill at grade or underground utility pipe kickers. <br />G. separate masonry waste and place in designated area <br />for use as structural fill. <br />H. Separate selected masonry waste and excess for <br />landscape uses, either whole or crushed as ground cover. <br />I. Protect all installed masonry from damage and <br />staining. Cover immediate ground area with materials that do <br />not compromise termite treatment. <br />J. Use the least toxic sealants, adhesives, sealers, and <br />finishes necessary to comply with the requirements of this <br />section. <br />SPECIFIC SECTIONS <br />[INSERT THE FOLLOWING ADDITIONAL PROVISIONS UNDER PART 3 <br />EXECUTION, WASTE MANAGEMENT, UNLESS OTHERWISE NOTED.] <br />04200 UNIT MASONRY <br />A. sefore proceeding with the work, verify all unit, <br />modular, and system requirementa. <br />END OF DIVISION <br />