My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specs: Water Spec/ Supplementary
>
CS_Courthouse Square
>
Bid Specs: Water Spec/ Supplementary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:23:02 AM
Creation date
8/1/2011 11:58:56 AM
Metadata
Fields
Template:
Building
RecordID
10053
Title
Bid Specs: Water Spec/ Supplementary
Company
Arbuckle/Costic
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Procurement
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DIVISION 1 <br />GENERAI~ REQUIREMENTS <br />SECTION 01010 <br />SUMMARY OF THE WORK <br />------------------------------------------------------------- <br />EDIT TO SUIT PROJECT AND LOCATION. <br />UNDER THE FOLLOWING HEADINGS, INSERT APPLICABLE STATEMENTS. <br />------------------------------------------------------------- <br />PART 1 - GENERAT. <br />COORDINATION <br />A. Waste Management Coordination: Coordinate <br />recycling of materials with owner and as required <br />to conform to the Construction Waste Management <br />Plan defined in Section 01505. <br />[THIS IS AN APPROPRIATE LOCATION FOR ADDITIONAL <br />LANGUAGE PERTAINING TO ENVIRONMENTAL ISSUES BEYOND <br />TIiE SCOPE OF THIS WASTESPEC, SUCH AS A REQUIRED <br />ENVIRONMENTAL PROTECTION PLAN OR REQUIRED BUILDING <br />MATERIALS WITH RECYCLED CONTENT.] <br />MEETINGS <br />A. Contractor shall conduct Construction Waste <br />Management meetings as outlined in Section 01200 - <br />Project Meetings. At a minimum, waste management <br />goals and issues ahall be discussed at the <br />following meetinqs: [LIST THE REQUIRED TYPES AND <br />NUMBERS OF MEETINGS AND ATTENDEES. EDIT LIST BELOW <br />TO SUIT PROJECT.] <br />1. Pre-bid meeting. <br />2. Pre-construction meeting. <br />3. Regular job-site meetings. <br />4. Job safety meetings. <br />CUTTING AND PATCHING <br />A. Use on-site waste as primers, sealers, <br />underlayments, supports, backing, blocking, <br />furring, suspension systems, and accesaories as <br />required for any purpose in patching existing work. <br />[CHECR WITH OWNER AND LOCAL CODES FOR ACCEPTABILITY <br />OF REUSE OF ON-SITE WASTE IN NEW CONSTRUCTION. <br />REFER TO SECTION 02050 - DEMOLITION FOR EXAMPLES.] <br />[THIS IS AN APPROPRIATE LOCATION FOR ADDITIONAL <br />LANGUAGE PERTAINING TO ENVIRONMENTAL ISSUES BEYOND <br />
The URL can be used to link to this page
Your browser does not support the video tag.