My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specs: Water Spec/ Supplementary
>
CS_Courthouse Square
>
Bid Specs: Water Spec/ Supplementary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:23:02 AM
Creation date
8/1/2011 11:58:56 AM
Metadata
Fields
Template:
Building
RecordID
10053
Title
Bid Specs: Water Spec/ Supplementary
Company
Arbuckle/Costic
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Procurement
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 01030 <br />ALTERNATES <br />**OR** <br />SECTION 01031 <br />WASTE MANAGEMENT / RECYCLING ALTERNATES <br />------------------------------------------------------------- <br />INCORPORATE APPLICABLE STATEMENTS BELOW INTO STANDARD SECTION 01030 - <br />ALTERNATES; <br />**OR** <br />INCLUDE SEPARATE SECTION 01031 - WASTE MANAGEMENT / RECYCLING <br />ALTERNATES. <br />IF THE PROJECT IS BID, THIS SECTION CAN BE USED TO OBTAIN AND ISOLATE <br />COST INFORMATION ON PROPOSED JOB SITE RECYCLING SO THAT THE OWNER CAN <br />DETERMINE THE FEASIBILITY OF IMPLEMENTING SOME OR ALL RECYCLING <br />MEASURES. ALLOW ADEQUATE TIME FOR DISCUSSION OF WASTE MANAGEMENT GOALS <br />AND BID PREPARATION IF REQUIRING AI,L BIDDERS TO SUBMIT RECYCLING <br />ALTERNATES IN ORDER TO RECEIVE REALISTIC BIDS DUE TO BASIC UNFAMILIARITY <br />WITH CONSTRUCTION WASTE MANAGEMENT. <br />**OR** <br />IF THE PROJECT IS NEGOTIATED, OR IF THE OWNER REQUIRES ONLY THE <br />SUCCESSFUL BIDDER TO SUBMIT A WASTE MANAGEMENT PLAN, THIS ALTERNATE <br />SECTION MAY BE OMITTED IN FAVOR OF DEVELOPMENT OF THE DRAFT WASTE <br />MANAGEMENT PLAN AS OUTLINED IN SECTION 01505 - CONSTRUCTION WASTE <br />MANAGEMENT. <br />EDIT TO SUIT PROJECT AND LOCATION. <br />UNDER THE FOLLOWING HEADINGS~ INSERT APPLICABLE STATEMENTS. <br />------------------------------------------------------------- <br />PART 1 - GENERAL <br />SUMMARY: ALTERNATE BIDS <br />[EDIT BELOW TO SUIT PROJECT.] <br />A. it is intended that referencea in the Bid Forms to <br />"Waste Management/Recycling Alternate Bid" shall <br />refer directly to this section. Information <br />included is provided for use of the bidders in <br />completing their Bid Proposals and will not be <br />repeated on the Bid Forms. <br />SCHEDULE OF ALTERNATES <br />[EDIT BELOW TO SUIT PROJECT.] <br />
The URL can be used to link to this page
Your browser does not support the video tag.