My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Contracts/Amendments
>
CS_Courthouse Square
>
Contracts/Amendments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 11:45:11 AM
Creation date
8/1/2011 4:59:01 PM
Metadata
Fields
Template:
Building
RecordID
10059
Title
Contracts/Amendments
Company
Arbuckle/Costic
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Contracts - Agreements
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DEC-21-98 MON 15~49 ARBUCKIE COSTIC ARCH INC FAX N0, 5035813655 P,0?/20 <br />. ; <br />KiiTi ~VthJfk~~, PJA <br />Aldrt E. :.n~riC, 11V1 <br />'~U31[2r [. 6,•rqruc~n. 1i , AV~. <br />"i I "~yf0~ i ~~/~XS~, !U~ <br />r~~;rr, r~~. rc,;;,:., nv~ <br />~ , e~;~~.;ra I.odd~.r. ~tn <br />Itl(h~i((.1 ~. ItJ!r~vr:'il~r. f•,li~ <br />July 28, 1598 <br />Biily Wasson <br />Project CaCoorQfnatoNDirecto~ of Corrections <br />Marion Caunty <br />4040 Aumsvilfe Highway SE <br />Satem, Oregon 97302 <br />RE: Acoustical Consultant Servicos <br />Relationship of Buses to Office Building <br />Courthouse Square <br />P~ojeci No. 9828 , ~j <br />Dear 6illy: <br />~._.......__ .__ _..........---_'-'--"-- <br />ARBUCKIE COSTIC ARCHITECTS, INC. <br />jG i jl: ilr. >lic;•i't <br />~.,len,, l~R4i?~,~~;~:.i; <br />5~~315Ri•?I14 F;ix '~ii.;/~t31 ~65ti <br />F-~L~4aii: riC~ii('IlC3k?~~:fl.f~fiJ, ~ E C~~ V E D <br />~fUL 3 ~ 1998 <br />;VIARION COUNTY CORRECjEQNS <br />WORK CENTER <br />As agreed in a previous development team meeting, we received a proposal from an acoustical consultant <br />as arcanged by C~aig Lewis of Meivin Mark Development. Attached herein is a copy of their proposa! for <br />basic services to measure existing sound levels and to pravide recommendation to mitigate the transfer of <br />bus operations noise from the bus transfer mall to ihe interior of the building. As indicsted in their `scope <br />of worfc," they a~ticipate involvement during the canstn,dion document phase as well as during constrUCtion. <br />Should they be asked to expand on their teRns of reference during the cou~se of the worlc, a schedule of <br />rates has bee~ includod. <br />Arbuckle Costic Architecfs will invoice the actuat cost of fnvoices received from Altermaft AssoCiates plus <br />ten p+ercerrt to coverthe overt~ead. If this arrangement is acceptable, please sign befow and return one copy <br />for our files. <br />If you have any questions, please do not hesitate to call. <br />Sincere , <br />G <br />, <br />- eo Loddc~, AIA-T~ <br />Architect <br />LL:mh <br />Encl. <br />cc: Craig Lewis, Melvin Ma~ks Development <br />John Whittington, Saiem Area Mass Transit <br />9628. S A <br />~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.