Laserfiche WebLink
DEC-21-98 MON 15~50 ARBUCKLE COSTIC ARCH INC FRX N0, 5035813655 P,10/20 <br />Leonard l..odder <br />)uly 21, 1998 <br />Page 2 <br />1_2.2 The c~irrently pianncd exterior buildin~ wdlls and window systems would be evaluated <br />and modifications recommendec! for adequate reduction of bus noise levels in~o incerior <br />spaces. <br />1.2.3 Vibration/movement characterist.ics of tlle planned building struccure adjacent to the bus <br />mall wotild be evaluaied. Recotnmendations of modifications ta structure to improve <br />vibration isolation, if required, wouid be provided. <br />i _3 Documentation <br />1.3.1 Measureilients, analysis and recommendations would be summarized in a let~.er report._ <br />1.4 1~ocum~nt f2eview <br />Review Construction Dacuments as they progress for appropriate incorporatioi~ of <br />rccomrnenda~io~is. <br />2. Contract Bidding or Negotiation Pl~aSe <br />Review contractor submittals provided in support of alteri~ate systems proposed by t.he <br />contractor pertaii3ing to tiiis Cotisultar~t's work. <br />3. Construclion Phasc <br />3.1 Assist the Architect in the administratiot~ of the Construc[ion Cantract with ~espect to <br />t.i~e Go~tsultant.'s V~lork. <br />3_2 The Consultant shall at a1l times l~ave. access to tl~e Work of This Portion of tlle Project <br />witerever it is in preparation or progress. <br />3.3 Review any shop drawings, samples and other submissions of thc Contractor which <br />relate to the Consultan['s Work and are either departures i`rom the Construction <br />Uocutnencs as amended by approved substitutions and change orders, or require <br />Consultant's review by [he Construction Documents. Review wouid be made ot~ly foc• <br />conformance with the design concept and for compliance with [he information givcii in <br />the Contract Documents. All comment5 and apProvals would be submitted to the <br />~ Arch itcct. <br />3.4 Assist the Architect: in preParinf; C_'han~e (~rders r.claie.~ io the Consultant's Work. <br />