My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Security- Miscellaneous
>
CS_Courthouse Square
>
Security- Miscellaneous
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:10:19 PM
Creation date
8/2/2011 10:27:27 AM
Metadata
Fields
Template:
Building
RecordID
10287
Title
Security- Miscellaneous
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
'' ~' ~ ~'larion Count <br />~ <br />OREGON <br />SUPPORT SERVICES DEPARTMEHT <br />~W~ ~F <br />C~NNISSI~MEiS <br />Pettl Miln <br />Mib Mw <br />Rand~ll Fnnke <br />i~r~u~ e~e~mr <br />A~rIMISiYiO~ <br />letl DtYfs <br />DIRECTOR OF <br />SUPPORT <br />SERVICES <br />o~w~ ~. e~rn~, <br />iel~~~~~e: <br />[50a1589-SY95 <br />F~x: <br />~5oa~ 5ss,~ass <br />[50a1588-1951 <br />~ms~ms: <br />eus~wasSeMces <br />FeCilitl~s <br />Nan~~ S~nAces <br />~m•r~~n•o systen: <br />Risk M~e~lemem <br />MEMORANDUM <br />TO: Board of Commissioners <br />FROM: Sara Stevenson, Risk and Benefits Manager <br />DATE: <br />RE: Security in Courthouse Square <br />BACKGROUND: <br />On August 31, 1999, the Board considered a preliminary report from a consultant <br />retained by the County to analyze security needs at Courthouse Square. <br />Following discussion, the Board directed that a comprehensive report be prepared <br />by staff which provides specific recommendations and costs. <br />Accordingly, I drafted the attached report based on previous work of the <br />Courthouse Square Security Committee, and sent it for comment to the <br />Committee and representatives of each department to be housed in the new <br />building. I received their feedback and made revisions. The report was then sent <br />to the Courthouse Square Development Team far feasibility and cost information. <br />This report is intended to provide you with an "overall" plan for security and <br />safety in Courthouse Square, keeping in mind that it should remain flexible so that <br />enhancements can be made following occupancy as it is impossible to anticipate <br />all needs until that time. <br />ISSUES: <br />It may be helpful in moving us toward resolution to put a framework around these <br />discussions by articulating the risks and costs we hope to avoid by proactively <br />planning for safety and security. <br />Numerous studies and research have documented the following: <br />~ Printed on Recycled Paper 3150 Lancaster Drive NE • Salem, Oregon 97305 <br />Reduce Reuse Recycle Recover www.open.org/marion <br />
The URL can be used to link to this page
Your browser does not support the video tag.