Laserfiche WebLink
JUL-23-99 FRI 10~53 ARBUCKLE COSTIC ARCH INC FAX N0, 5035813655 . P.05/06 <br />CHANGE ORDER <br />PROJECT: Courthouse Square <br />(namo, address) 555 CouR Street NE <br />Salem, Oregon 97301 <br />TO: Pence/Kelly Construction, Inc. <br />(contraceor~ 2747 Pence Loop SE, P.O. Box 4109 <br />Salem, Oregon 97302-8109 <br />You are directed to make the following changes in this Cantract: <br />CHANGE ORDER NUMBER: <br />INlT1ATION DATE: <br />ARCHtTECT'S PROJECT NO.: <br />CONTRACT FOR: <br />CONTRACT DATE: <br />July 22, 1999 <br />9828 <br />General Construction <br />February 17, 1999 <br />Contractor's Change Order Raquest, C.O.R. # 21, remo~e and dispose off site 461.62 c.y. <br />contaminated soil, ~$60.00 / c.y. Add S 27,697.00 <br />2. Contracto~'s Change Order Requast, C.Q,R. # 51, provide over excavation and compacted fill <br />at locations of undocumented fill for areas # 4 through ~ 8 per the attached backup <br />documentation. Add $ 90,846.00 <br />Total for Change Order No. 7 S 118,543.00 <br />Not va4d untit atproed by DoUi [he Owner :mtl RrUi~en, $Ignature ot the Concrg~or indi~yt~a agroomenl herr.Yritn, ~ncl~qinp arty sdjusvnenl in the Ca~lruIX Sum er Cortved Time. <br />The original Contract Sum was $ 18,459,484,40 <br />Net change by previvusly authorized ChanQe Orders $ 380,968.00 <br />The Contract Sum prior to this Change Order was $ 18,840,452.00 <br />The Contract Sum will be (increased} (~ias~ by this Change $ 118,543.00 <br />The new Contract Sum including this Change Order will be $ 18,958,995.00 <br />The Contract Time will be ~) {~escease~~(unchanged) by 0 days <br />The Date of Substantial Completion as of the date of this Change Order therefore, is November 3, 2000 <br />~,.:.~.~,,,~.~,,,~..,,~.~»,.~,.,.~~,»..,~.,,,n„r»,...,~~,,.,...__........,.~...__...___ ........ .......- - ----- <br />__ ._________.____.._...._.-- <br />Owner. p~,,,,~~ <br />Marion County Salem Area Mass Transit District <br />100 High St. NE 3140 Det Webb Ave. NE <br />Salem, OR 97301 Salem, OR 97303-4165 <br />~BY: ~By: <br />(Date: 1Date: <br />~~~e~~ Contractor: Project Manager <br />Arbuckle Costlc Architects, lnc. Pence/Kelly Construction, Inc. Melvin Mark Development Co. <br />363 StatE Street P.O, Box 4109 111 SW Columbia, Suite 1380 <br />Salam, Oregan 97301-3655 Salem, Oregon 97302-8109 Portland. Oregon 97201 <br />~By~ ,~ lBy~ Iey: <br />Date: <br />Date: <br />Date: <br />Page 1 of 1 File: 9828-11 b <br />