<br />CHANGE ORDER
<br />PROJ~CT: Courthouse Square CHANGE ORDER NUMBER: g
<br />(name, addreas) 555 Cou~t St~eei NE
<br /> Salem, Oregon 97301 INITIATION DATE: July 22, 1999
<br /> ARCHITECt'S PROJECT NO.: gg2g
<br />TO: Pence/Kelfy Construction, lnc. CONTRACT fOR: General Construction
<br />(convae~or} 2747 Pence Loop 5E, P.O, Box 4109
<br /> Salem, Oregon 97302-8109 CONTRACT DATE: February 17, 1999
<br />You are dfrected to make the following changes in this Contract:
<br />~. Provide excavation, removal and disposal of three tanks in the northwest corner of the site,
<br /> lnclude bracing of traffic signal pofes, all as per C,O.R. # 3. Add $ 14,135.00
<br />2, Provide rework of forms, relocating stored rebar and dewatering related to over excavation
<br /> work under C.O.R, # 20, as per C,O.R. # 7. Add $ 6,966.00
<br />3. Cost sharing for Courthouse Square Partnering Session, as per C.O.R. # 8. Add $ 1,876.00
<br />4, Pfovide cavity wall insulation at exterior masonry walls of rooms 1209, '1219 and 1239,
<br /> as per C.O,R. # 10 Add $ 1,394.Od
<br />5. Delete Sump pump at Elevator # 1 per R.F.1. # 158 and C.O,R. # 13, Deduct $ (700.00)
<br />6, Value Engineering Proposal # 1, Delete Low"E" coating on #3 surface of Bus Mall
<br /> Glass Canopy System as per C.O,R. #! 18. Deduct $ (~8,723.00}
<br />7. Value Engineering Proposal # 2, Rep(ace 1600 Amp bus duct with conduit and wire for
<br /> feed to the foaf top equipment switchboard, per C.O,R. # 19. Deduct $ {~,744.00}
<br />S, Provide couplsrs at top of parking level calumns for future north pad devefopment
<br /> per C.O, R, # 22, Add $ 5,193.00
<br />9, Delete Post tensioning Tendon locators per C.O.R, # 23. Deduct 5 (440,00)
<br />'10. Revise column ties after fabrication per R.F.I. # 224, as per C.O.R. 26. Add $ 993.04
<br />11. Provide column Tai! revisians per R.F.I. # 41 and C.O,R. # 27, Add S 538.00
<br />12. Revise columns per R.F.i.s # 119 and 120, as per C.O.R. 29. Add 3 9,534.OU
<br />13. Provide added rebar at isolation joints per R,F.I. # 37, as per C.O,R. 30. Add $ 2,775.00
<br />14. Delete Link seal and ESP-1 per Proposal Request # 7, per C.O,R. # 33. Deduct $ (1,081.00}
<br />15. Revise columns to go to roof level at grids 0/9~ 8~ 0/'!2 per R.F,i, # 34,
<br /> as per C.O,R. ~ 35. Add $ 6,074.40
<br />16, Revise column type at grid J-10a per R,F.I # 59 and C.~.R. # 36. Deduct $ (2,547.00)
<br />•tT, Proviae reinforcing at sfab on grade beneath columns per R.F.I. ~ 157,
<br /> as per C,O.R, # 38. Add $ 790.00
<br />Page 1 of 2