JUL-23-99 FRI 15~14 ARBUCKLE COSTIC ARCH INC FAX N0, 5035813655 P,03/0~
<br />18. Provide added footing and coiumn per R.F.I. # ~04 and C.O,R. # 39. Add $ 2,053.00
<br />19. Value Engineering Proposal # 3, Revise precast panels to mitered corners instead of
<br /> "U" shape, Owner's share as per C.O.R. # 42. Deduct $ (8,962.00)
<br />20. Provide flourescent lamp revisions per Proposal Rpquest # 25, as per C.O.R. # 44, Add $0.00
<br />21, Provide hollow metal frame revisions per Proposa) Request # 12, as per C.O,R. # 45, Add $0,00
<br />22. Provide floor hardener at rooms 1209, 121g and 1239 per R.F,I. 78, as per C.O.R, # 47, Add 5963.00
<br />23. Change wall mounted water closet to floor mounted water closet in room 1224,
<br /> per Proposal Request # 17, as per C.O.R. # 48, Add $105.00
<br />24. Remove underground tank in Church St., as per C.O.R, # 50, Add $315.00
<br />25. Revise foundation drain pipe specification per Arbuckle Costic fax transmittal dated 7l7/99
<br /> ,
<br />as per C.O, R. # 53.
<br />Add $
<br />3,186.00
<br />26. Provide added reba~ for pilaster at the SW air shaft pef R.F.I, # 215,
<br /> as per C,O.R. # 54. Add $ 1,210,00
<br />27. Provide changes to glazing per Proposal Request # 22, as per C.O.R. # 56, Deduct $ (83.00)
<br /> Totaf tor Change Order No. 5 $ 23,820.00
<br />Not vtilld until x~pn~d by Do~h ths OwR+cr rnd ~rcnhc~.t. Signpture ot the C;ontt5etor inAicatrs agreemenk hwennth, ineluCing any adjusvrkne in rhe Contrac[ 5um or Conveee 7imo.
<br />The original Contract Sum was $ 18,459,484.OQ
<br />Net change by previously authorized Chang~ Orders
<br />$ 325, 899.00
<br />The Contract Sum prier to this Change Order was $ 18,785,383,00
<br />The Contract Sum will be (increased) (~er~eaEe~} by this Change $ 23,820.00
<br />The new Contract Sum including this Change Order will be $ 18,809,203.00
<br />The Contract Time will be (+~c,~eaee~} (.~ec,~sa~sed}(unchanged) by o days
<br />The Date ot Substantial Completion as of the date of this Change Order therefore is Navember 3, 2000
<br />t••..,...s.ss..:>•~ ~....:.e..>:
<br />~Y::.g:C;:s:.'1..as+a:t~r,:u.u .--- ~:.:....:.•, o..._.:..... ._. _, . . .....
<br />__..__ ._ .....
<br />DYJI1e~; OW11Qf:
<br />Marion Gounty Salem Area Mass Transit District
<br />100 High St. NE 3140 Del Webb Ave. NE
<br />Salem, OR 97301 Salem, OR 97303-4165
<br />lBy~ J sy:
<br />~Date; ~ Date;
<br />~~~~e~~ Contractor. . ?~oJect Manager;
<br />Arbuckle Costic Architects, Inc, Pence/Kelly Construction, Inc. Melvin Mark Development Co,
<br />363 State Stiee# P,O. 8ox 4'!09 '11'! SW Coiumbia, Suite 1380
<br />Salem, Oregon 9730'1-3655 Salem, Oregon 97302-8109 Portland, Oregon 97201
<br />~ BY~ ~ By: ' gy•
<br />jDate:
<br />Datc~
<br />9828-11 b
<br />Page 2 of 2