My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Orders and Log
>
CS_Courthouse Square
>
Change Orders and Log
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:10:34 PM
Creation date
8/2/2011 10:37:51 AM
Metadata
Fields
Template:
Building
RecordID
10057
Title
Change Orders and Log
Company
Arbuckle/Costic
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
, <br />ii' <br />ARBUCKLE COSTIC ARCHITECTS, INC. <br />363 State Street <br />Salem, Oregon 97301-3533 <br />(503) 581 ~ I I 4, Fax (503) 581-3655 <br />E-Mail: ~.s~~hw~~~~~ct:~a-~~c~t€~~.ttA€;e.,cA~n <br />Courthouse Square <br />Project No. 9828 <br />Date printed: December 8, 1999 <br />/ <br />t~1,(1~-' ' ~ <br />~ ~~ <br />LOG OF OUTSTANDING <br />CHANGE ORDER REQUESTS <br />C.O.R. <br />.#~ Proposed <br />Value Ball.in <br />Court: n, <br />~ Description <br />40 ($3,830.00) P/K PR 10, reduce fire rating at Main Lobby (Increase Sprinkler credit) <br />86 $12,354.00 P/K Hardware and access card security back boxes. <br />90 $5,971.00 ACA y Tube steel columns at Elevator 3, (needs to be reconciled relative to <br />concrete shown on structural drawings.) <br />97 $77,3 I 6.00 City of <br />Salem Provide additions and revisions to the traffic signalization plan per PR <br />I I <br />I 04 $ I,33 I.00 P/K Ceilings in Service areas, awaiting revision from P/K <br />106 $784.00 P/K Additional re-bar per RFI 314 <br />120 $4,859.00 P/K Sandblast finish to exterior stairs,( $767 + O+P ) <br />I 3 I $2,455.00 ACA y Provide Transformer Sled per PR 63 <br />I 35 $905.00 IEIC Provide modified sequence of operation for AC-4 per RF) 284 <br />I 37 $6, I I 2.00 P/K Provide Changes to pumps P-2 and P-3 per PR 47, Provide circuits and <br />wiring for P I -3. <br />I 38 $4,482.00 P/K Provide modification to Duct work at Canopy Braces per RFI 338 <br />I 39 $7,555.00 P/K Provide Mortar Net and Perma-Barrier per RFI 366 <br />I 42 $2,240.00 P/K Provide Aluminum Tube Filler where stud walls terminate at windows <br />per RFI 390 <br />144 $548.00 CWEC y Provide Embedmerrt for Brick Support at Eyebrows per RFI 400 <br />I 45 $523.00 CWEC y Provide repair to Arcade Beams per RFI 364. ??????? <br />146 $36,335.00 ~~TOD Provide Deck Coating System per P.R. 54 <br />I 48 $ I,039.00 CWEC Provide Ledger Angle per RFI 403 <br />153 $96,581.00 IEC y Provide Access Control System per RFI 35 <br />154 $529.00 IEC y Provide FirelSmoke Damper per RFI 417 <br />156 $5,298.00 IEC - P/K Provide condensate drains to Sanitary per RFI 412 <br /> <br /> <br />I 59 <br />$6, I 68.00 <br />CWEC / <br />Provide angle support for 6" studs at column bases along grid line 3a <br />and 10 <br /> <br />v <br />v <br />
The URL can be used to link to this page
Your browser does not support the video tag.