Laserfiche WebLink
JUL-23-99 FRI 10~52 ARBUCKLE COSTIC ARCH INC FAX N0, 5035813655 !_.__._ ._ P,04/06 <br />CHANGE ~RDER <br />PROJECT: Courthouse Square <br />(rsan+e, add~ess) 555 Court street NE <br />Salem, Oregon 97301 <br />TO: Pence/KeUy Cons#ruction, Inc, <br />(convactor} 2747 Pente Loop SE, P.O. Box 4109 <br />Salem, Oregon 97302-8109 <br />You are direoted to make the fallowing cha~ges in this Contract: <br />CHANGE ORDER NUMBER: <br />INITIATION DATE: <br />ARCHITECT'S PROJECT NO.: <br />CONTRACT FOR: <br />CONTRACT DATE: <br />6 <br />July 22, 1999 <br />982$ <br />Genera! Construction <br />February 17, 1999 <br />1. Provide 6 parallel parking stalls atong the south side of Chemeketta St.. Refocate future <br />construction trailers from Chemeketta St, to Church St.. Parking stripe painting at stalls <br />is by others. The City of Salem is to allow one additional traffic lane along the east side of <br />construction site for construction use for the entire biock length. The added parking will <br />~emain untii construction along Chemeketta St. resumes in 2Q00, as per C.O,R. # 28. Add $ 32,437.Q0 <br />Total for Change Order No. 6 <br />S 32,437.00 <br />NOtwlld unLY sigr~0 py DdR me Oarnor and Arenhga. ~ign8ttlre ot me ConNaetof Indlatas ayhlmem nwnwph, IneNaieifl,nY ndjayemsnt In tlh Cuntrau 8um or c:ontrAa7ime, <br />The original Contract Sum was <br />Net change by previously authori~ad Change Orders <br />The Contract Surn prior ta this Change Order was <br />The Contract Sum wilf be (increased} (~ec,~aassd} by this Chahge <br />The new Con#ract Sum including this Change Order will be <br />The Contract Time will be {iflsFease~ 4deszeased}(unchanged} by <br />The Date of Substantial Comptetion as of the date of this Change O~der therefore is <br />Owner: Owner. <br />Merion County 5alem Area Mass Transit District <br />100 High St. NE 3140 Del Webb Ave. NE <br />Salem, OR 97301 Safem, OR 97303-4165 <br />(BY~ ISy: <br />$ 18,459,484.04 <br />$ 348,531.00 <br />$ 18,808,015,00 <br />$ 32,437.00 <br />$ 18,840.452.00 <br />0 days <br />November 3. 2000 <br />~Date; ~Date: <br />~'~e~~ Contractor: Project Manaper: <br />Arbuckle Costic Architects, lnc, Pence/Kelly Construction, Inc, Melvin Mark Davelopment Co. <br />363 State Street P.O. 8ox 4109 111 SW Colurrtbia, Suite 1380 <br />Salem, Oregon 97301-3655 Salem, Oregon 87302-8109 Portland, Oregon 97201 <br />~Br~ { 6y: I 8y. <br />Date: <br />Date; <br />Date: <br />no~e ,+~ <br />