Laserfiche WebLink
08/~0/2000 08:42 FAY 50a 581 a655 ARBtiCKLE COSTIC C~ 005/O11 <br />.~.-- <br />COMPANY <br />CO # 90 <br />CHANGE ORDER ANALYSIS <br />Summary Shect <br />Security (a~ poors 32Z0 & ~1210 DA7E- <br />A TOTAL PRICE THIS CHANGE ORDER <br />as shown in item ] 5; <br />B. Scope to b~ perfot7rt~ed: <br />1. See attached documents <br />C. Cosi Surin~nary: <br />1. Total Material Cost (see back-up) <br />2. Tota! Burdened Labor Cost (see back-up) <br />3. Subcontractors Cost (see bac~C-up} <br />4. Equipment Cost (see back-up) <br />5, pther Miscellaneous Costs (see back-up) <br />6. Small TooI allaw d % of item 2 <br />7. Record Dra,wings and Submittals <br />g. Warran~iy Work 0.00 % of direct expens~s <br />9_ Overhead 10 % <br />10. PROPIT at p % <br />11. B&4 Tax % WA on~y <br />12. S 31e5 TaX 0. 00 % <br />13_ Bond O.OO % <br />TOTAL PRIC~ TI-IIS CHANGE ORDER <br />This change order requires a schedule adjus#ment of 0 <br />revision after 30 days. <br />~ 5,186.00 <br />187.00 <br />o.oa <br />0.00 <br />0.00 <br />U8/10/~0 <br />537.30 <br />0.00 <br />$ 5,910.30 <br />days. Pricing subject to <br />The costs represented incfude only those clearly identified at this time, No impact or delay costs are <br />included. Should it be determined at a later date that the project is impacted by multiple scope <br />changes, or causes beyond our control, those costs may be submitted at that time, Work will commence <br />upon written acceptanca by an authorized agent. <br />$ 5,910.00 <br />EC Proposal # : 62759-90 <br />Owner's Ref. #: PR-132 <br />E C Company Authorized Agent <br />Craig Davis PM <br />