Laserfiche WebLink
04/19/2000 12:27 FAX 503 581 a655 <br />fi <br />~- <br />COMPANY <br />CO # 61 <br />ARBUCKLE COSTIC ~ 009/011 <br />CHANGE O~iD~R ANALYSIS <br />Summ:iry Slicct <br />AJditianal Thcr-op~ic cahic runs Dnl'1:: Oa/IJlUO <br />r11,'1'1~1~N/~ll; ~iZ <br />EC Proposal # : C27~9-61 <br />OHner's REf, #: PR-)2 <br />A. TOTAL PR1Cf ThfIS CHANGE ORDER <br />as sho~~T~ in iiem 1~; $ 6,750.00 <br />B. Scopelo be perlornied: <br />1, See ~ltadled documenis <br />C. Cost Sun~zry: <br />l. Tolal Material Cost (see back-up) $ 5,016.00 <br />2. Total Butdened Labor Cost (see back-up) 1,120.Q0 <br />3. Subcontractors Cost (see back-up) 0,00 <br />4. Equipme.nt Cost (see back up) 0.00 <br />~. Other Miscellaneous Costs (see back-up) 0_00 <br />6. Small Tool alloµ~ 0 % of iter~ 2 <br />7. Record brawings and Submittals <br />8. Warran~j~ Work 0.00 % of direct e~,pe,nses <br />9. Overhead 10 % 613,60 <br />1 ~_ ~RO~IT at 0 % <br />1 l_ B&O Tat %~XrA oIIly <br />12_ Sales 7a~ U. (l0 % <br />13_ Bond O.UU % 0.00 <br /> TO'TAL ~RICE TIi~S CHANG~ ORDER $ 6,749.6~ <br />This change order requires a schedule adjustment of 0 days. Pricing subject to <br />revision after 30 days. <br />The costs represenjed include only those clearly identified at this time. No impact or delay costs are <br />included. Shouid it be determined at a fater date that the project is impacted by multiple scope <br />changes, or causes beyond our contral, those costs may be submitted at that time, Work will commence <br />upon written acceptance by an authorized agent, <br />E C Company ~ Authorized Agent <br />Craig Davis PM <br />