Laserfiche WebLink
3140 Del Webb Avenue NE <br />Salem, OR 97303-4165 <br />503-588-2424 Fax 588-0209 <br />E-mail: cherriots.org <br />May 14, 1998 <br />Leonard Lodder <br />Arbuckle Costic Architects, Inc. <br />363 State St. <br />Salem, OR 97301 <br />Dear Leonard, <br />~ia~YLO~+l <br />As we are a11 aware, the County and Transit District Boards have formally acted to proceed <br />with the Courthouse Square project, through the point of design development and cost <br />estimation for the project. Depending on the results of design development and cost <br />estimation, a decision will be reached by the two bodies as to whether or not to proceed <br />further, to construction documents and bidding. <br />Based on the action taken by our Boards, we have asked Arbuckle Costic Architects, Inc. to <br />move ahead with the next steps of design work, consistent with their direction. This letter <br />serves to formally confirm our direction to complete any needed elements of schematic design <br />and proceed ahead to design development and cost estimation, in accordance with the <br />provisions of the agreements which have been reached to guide this project (the interim <br />agreement, the addendum to the interim agreement, the AIA contract, the supplemental <br />provisions of the AIA contract, and the Federal contract requirements). <br />On behalf of the District and the County, we are looking forwaxd to working with you and <br />your firm to complete theses next stages of work. . <br />Sincerely, <br />Whittington <br />Project Coordinator <br />Salem Transit District <br />cc Nick Hockens, FTA <br />~ <br />Billy asson <br />Project Coordinator <br />Marion County <br />