My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interim Architect Agreement/Contract
>
CS_Courthouse Square
>
Interim Architect Agreement/Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 11:47:23 AM
Creation date
8/2/2011 11:15:47 AM
Metadata
Fields
Template:
Building
RecordID
10061
Title
Interim Architect Agreement/Contract
Company
Arbuckle/Costic
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Contracts - Agreements
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TERMS AND CONDITIONS OF AGREEMENT BETWEEN OWNER AND ARCHITECT <br />ARTICLE 1 ~ <br />ARCHITECTS RESPONSIBILITIES <br />1.1 ARCHITECT'S SERViCES <br />Se¢. S P L 1.0 <br />1.1.1 The Architecl's sennces consist of those sen~ices <br />performed b}~ the Architect, Architect's employees and <br />Architoct's consultants as enumerated in ARic(es 2 and 3 of <br />this Agreenient and am~ oiher sen~ices included in Article <br />12. <br />1.1.2 The Architect's sen~ices shal( be performed as <br />e.~paditiously as is consistent ~vith professiona( skill and care <br />and tt4e orderty progress of the Work. Upon request of the <br />Owner. the Architect shall submit for the O~me~'s apprrn~al a <br />schodule for the performance of the Architect's services <br />«fiich may be adjustod as the Project prooeeds, and shall <br />include atlowances for periods of time c+aquired for the <br />O~mer's revie~v and . for approval of submissions by <br />authorities ha~~ing jurisdiction over the Project. T~^~-r.~..~'.~ <br />S~ s P 1.1.2 .I <br />1.3 The sen~ices co~~ered by this Agreement are subject <br />the time limitations contained in Subparagraph 11.5.1. <br />See, S? 1. i. ~ - ~. ~-l <br />2.2.3 The Architect shall revie~v with the Owner <br />alternati~~e approaches to design and construction of the <br />Project. <br />2.2.4 Based on the mutuall}~ agreed-upon program, <br />schedu(e and construction budget requirements. the Architect <br />shall prepare, for approval b}~ the O~+~ner. Schematic Design <br />Documents consisting of dra«~ings and other documents <br />illustrating the scale and retationship of Projeci components. <br />See: Sf ~.1.a.\ <br />preliminarv estimate of sed on current <br />2.3 DESiGN DEVELOPMENT PHASE <br />2.3.1 Based on the apprrn~ed • Schematic Design <br />Documents and any adjustments aulhorized dy the O~vner in <br />the program, schedule or oonstruction budge.t, the Architect <br />shall prepare, for appro~~al by the O~F~ner, Design <br />Developmeni Documents consisting of dra~vings and other <br />documents to fix and describe the size and character of the <br />Project as to architecturat. stcuctural, mechanical and <br />eleclrical s~~stems, materiats and such other elements as may <br />be appropriate. <br />S<e S 4 ~_'~.\.\ <br />ARTICLE 2 <br />SCOPE OF ARCHITECTS BASIC SERVICES <br />2.1 DEFINITION <br />2.1.1 The ArchitecCs Basic Services consist of those <br />described in Paragraphs 2.2 through 2.6 and any other , <br />secvices ic~~tif~c~in A~r~cle 12 as part of Basic ~Secvices, and <br />) Y~ 1 ~M ~M~ ~ •w ~t'Yl <br />in ud~ nPrma~ $oruc~a~ra1 ~mechz~c~ ~~ee~e}e(~ ~ca1~~Y <br />e 4 ~ «~ ~ ` <br />~ engineenng sen,~ o.•. t t~. ~a"~ a t,e ~ k~ :~ u+~ a* ~~ ~~d <br />co..c e ~.\e d i,o.~d~;l~~ e..S ) <br />nQct.e~y 1s p~,.~ a. c.oa. ~e~t e,.dl wet~~ a¢t ~ <br />2.2 SCHEMATIC DESIGN PHA~E S~~~t~~':°^ <br />. ~...~..t s <br />2.2.1 The Architect shall revie~~~ the program furnished by <br />the O~mer to ascertain the requiremeats of the Pr.oject and <br />shall arri~~e at a mutual understanding of such requirements <br />t~ith the O«mer. <br />2.2.2 The Architect shall provide a preliminary <br />et~a(uation of lhe O«°ner's program, schedule and <br />eonstcuction budget requirements. each in terms of the other, <br />subject to the limitations set forth in Subparagraph ~.2.1. <br />adjuslments to the r' _ ia e of Construction <br />Ce <br />2.4 CONSTRUCTION DOCUMENTS PHASE <br />2.4.1 Based on the approved Design De~~elopment <br />Documents and an~~ further adjustments in the scope or <br />quality of the Project or in the construclion budget authorized <br />by the O~~ner. the Architect shall prepare, for appro~~al by <br />the O«~ner, Construction Documents consisting of Dra~~~ings <br />and Specifications setting Corth in detail the requirements Cor <br />the construction of the Project. <br />See S~ a.a.~.~ <br />2.4.2 The Architect shall assist the O~~~ner in the <br />preparation of the necessa~~ bidding information. bidding <br />forms, the Conditions of the Contract. and the form of <br />Agreement bet«~een the O«°ner and Contractor. <br />adjuslments to pre~~ious re ~ _ estimates of <br />Construction C e b~~ changes in requirements or <br />~+e~s- - <br />. A DOCL'\(E\T B141 - O\1'NER :4RCH['I'ECT AGREEA{ENT - FOURTEENTH ED[TION -.alA - COPI`R[GHT 19R7 - THE AA{ERIC~ I\STITITf-. O~ <br />aRCHITECTS, 1735 ~E\1' 1'ORI: AVENUE Tl\1~._ \VASHINGTON_ D.C. 2000G-5292.: Unlicrnsrd plxua:opriag ~•iolatrs l~.S. copyright la~~s and is ~uhjc~~t to Itg:+l <br />pr~secuticm. This daKmir~it ~cas ela~trcaiicall~~ ~xoductd ~~titli lhe ~xmiis.~ioii of Ux .41A and can fK rrproducrd ~~•ithait ~iola~iai until Ux datt oCr.yiiration ac ~xutd lulo~~•. <br />Electronic Forniat Bl-~l-1937 <br />Use~ Document: 61419637.DOC -- 4/22/1997. AIA License Number 100632, which expires on 8/31/1997 - Page #2 <br />~ }-f' <br />
The URL can be used to link to this page
Your browser does not support the video tag.