agreement should reflect this as part of the services the Contractor is providing. <br />SP 2.5.2 Has been amended to eliminate "time is of the essence" language. Instead, the <br />Architect acknowledges the tight time schedule and promises to conform to the schedule <br />within the limits of professional prudence. <br />2.6.1 Has been modified to eliminate language the Architect disagreed with. Substitute <br />language has been added to require the Arcl~itect to remain on the project until the building <br />is commissioned. This is a more definable date. <br />2.6.5 Has been modified to limit tlle Architect's duty to visit the site and the purpose of <br />the visits to a requirement that the visits be enough to make the Architect sufficiently <br />familiar with the work to state it is in accordance with the Contract Documents. We see <br />the Architect as important to watch the progress of construction. <br />SP 2.6.5.1 Has been amended to delete reference to the Architect's performance at any <br />standard of care. Tllis has been addressed at 1.1.5. <br />2.6.12 Has been amended to limit the Architect's review of shop drawings to compliance <br />with Contract Documents. <br />2.6.16 Has not been amended. The Architect asked ti~at the phrase about not being liable <br />for good faith interpretations as between the Owner and Architect be left in. It remains <br />stricken. The Architect is responsible to make recommendations and interpretations of <br />Contract Documents using ordinary professional care. This seems reasonable in that the <br />Owner must rely on the Architect's professional judgment, and the standard of care is <br />insurable. <br />SP 2.6.20 Has been deleted. Providing as built drawings will be an extra service for which <br />the owners will pay. <br />3.3.1 Has been amended to better define "major" revisions, by substituting the phrase <br />"which require significant time and material cost". The purpose is to avoid having every <br />change, even typos, produce a bill for a"contingent" service. <br />3.4.10 Was added back in. <br />3.4.16 Was added back in. <br />3.4.18 Was modified to limit optional additional services to those provided after building <br />commissioning. <br />3.4.19 Was modified. Refer to 2.1. l. <br />SP 5.2.6 Was deleted. There is no fixed limit of cost for the project applicable to this <br />