My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interim Architect Agreement/Contract
>
CS_Courthouse Square
>
Interim Architect Agreement/Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 11:47:23 AM
Creation date
8/2/2011 11:15:47 AM
Metadata
Fields
Template:
Building
RecordID
10061
Title
Interim Architect Agreement/Contract
Company
Arbuckle/Costic
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Contracts - Agreements
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. ~ <br />Prohibited Interest - No member, officer or employee of Recipient or of a local public body during <br />his or her tenure or one year thereafter shall have any interest, direct or indirect, m this Contract or <br />the proceeds thereof. <br />2. In connection with the performance by Contractor of work or services within the scope of <br />this Agreement, Contractor agrees to comply with the following requirements, and to include these <br />requirements in all subcontracts exceeding $100,000 in value of every tier. Contractor further <br />agrees to include the Contract Work Hours and Safety Standards Act requirements in all <br />subcontracts exceeding $2,500 in value (but not including subcontracts for the purchase of <br />supplies, materials or articles ordinarily available on the open market): <br />Contract Work Hours and Safety 5tandards Act <br />Pursuant to Section 102 (Overtime): <br />(1) Overtime requirements - No contractor or subcontractor contracting for any part of the contract <br />work which may require or involve the employment of laborers or mechanics shall require or permit <br />any such laborer or mechanic in any workweek m which he or she is employed on such work to work <br />in excess of forty hours in such workweek unless such laborer or mechanic receives compensation at <br />a rate not less than one and one-half times the basic rate of pay for all hours worked in excess of <br />forty hours in such workweek. <br />(2) Violation; liability for ~mpaid wages; liquidated damages - In the event of any violation of the <br />clause set forth in paragraph (1) of this section the Contractor and any subcontractor responsible <br />therefor shall be liable for the unpaid wages. In addition, such Contractor and subcontractor shall be _ <br />liable to the United States for liquidated damages. Such liquidated damages shall be computed with __ <br />respect to each individual laborer or mechanic, including watchmen and guards, employed in - <br />violation of the clause set forth in paragraph (1) of this section, in the sum of $10 for each calendar <br />day on which such individual was required or permitted to work in excess of the standard workweek <br />of forty hours without payment of the overtime wages required by the clause set forth in paragraph <br />(1) of this section. <br />(3) Withholding for unpaid wages and liquidated damages - The Recipient shall upon its own action <br />or upon written request of an authorized representative of the Department of Labor withhold or cause <br />to be withheld, from any moneys payable on account of work performed by the Contractor or <br />subcontractor under any such contract or any other Federal contract with the same prime contractor, <br />or any other federally-assisted contract subject to the Contract Work Hours and Safety Standards Act, <br />which is held by the same prime contractor, such sums as may be determined to be necessary to <br />satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as <br />provided in the clause set forth in paragraph (2) of this section. <br />(4) Subcontracts - The Contractor or subcontractor shall insert in any subcontracts the clauses set <br />forth in this section and also a clause requiring the subcontractors to include these clauses in any <br />lower tier subcontracts. The prime contractor shall be responsible for compliance by any <br />subcontractor or lower tier subcontractor with the clauses set forth in this section. <br />(Section 102 nonconstruction contracts should also have the following provision:) <br />(5) Payrolls and basic records -(i) Payrolls and basic records relating thereto shall be maintained by <br />the Contractor during the course of the work and preserved for a penod of three years thereafter for <br />all laborers and mechanics working at the site of the work (or under the United States Housing Act of <br />1937, or under the Housing Act of 1949, in the construction or development of the project). Such <br />records shall contain the name, address, and social security number of each such worker, his or her <br />conect classification, hourly rates of wages paid (including rates of contributions or costs anticipated <br />for bona fide fringe benefits or cash equivalents thereof of the types described in section 1(b)(2)(B) <br />Addendum, FTA Contract Requirements <br />Page - 7 <br />0718970102 <br />
The URL can be used to link to this page
Your browser does not support the video tag.