Laserfiche WebLink
Leonard Lodder <br />July 21, 1998 <br />Page 2 <br />1.2.2 The currendy planned exterior building walis and window systems would be evaluated <br />and modifications recommended for adequate reduction of bus noise levels into interior <br />spaces. <br />1.2.3 Vibration/movement characteristics of the planned building structure adjacent to the bus <br />mall would be evaluated. Recommendations of modifications to structure to improve <br />vibration isolatio: . if required, would be provided. <br />1.3 Documentation <br />1.3.1 Measurements, analysis and recommendations would be summarized in a lei'~.er report. <br />1.4 Document Review <br />Review Construction Documents as they progress for appropriate incorporation of <br />recommendations. <br />2. . Contract Bidding or Negotiation Phase <br />Review contractor submittals provided in support of alternate systems proposed by the <br />contractor pertaining to this Consultant's work. - <br />3. Construction Phase <br />3.1 Assist the Architect in the administration of the Construction Contract wi+h iespect to <br />the Consuttant's Work. <br />3.2 The Consultant shall at all times have access to the Work of This Portion of the Project <br />wherever it is in preparation or progress. <br />3.3 Review any shop drawings, samples and other submissions of the Contcactor which <br />relate to the Consultant's Work and are either departures from the Construction <br />Documents as amended by approved substitutions and change orders, or require <br />Consultant's review by the Construction Documents. Review would be made only for <br />conformance with the design concept and for compliance with the information given in <br />the Contract Documents. All comments and approvals would be submitted to the <br />Architect. <br />3.4 Assist the Architect in preparing Change Orders related to the Consultant's Work. <br />COM\98153P <br />