My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arbuckle Miscellaneous
>
CS_Courthouse Square
>
Arbuckle Miscellaneous
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:13:51 PM
Creation date
8/2/2011 2:04:50 PM
Metadata
Fields
Template:
Building
RecordID
10376
Title
Arbuckle Miscellaneous
Company
Arbuckle/Costic
BLDG Date
1/1/1998
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
--.. ~_ <br />3140 Dei Webb Avenue NE <br />Salem, OR 97303-4165 <br />503-588-2424 Fax 588-0209 <br />E-maiL• cherriots.org <br />May 14, 1998 <br />Leonard Lodder <br />Arbuckle Costic Architects, Inc. <br />363 State St. <br />Salem, OR 97301 <br />. <br />~ . <br />~j~ <br />V _ <br />B <br />~l <br />{ '' <br />, ~~~~~~~ <br />Q <br />~? I <br />,. c~ <br />Dear Leonard, <br />As we are all aware, the County and Transit District Boards have formally acted to proceed <br />with the Courthouse Square project, through the point of design development and cost <br />estimation for the project. Depending on the results of design development and cost <br />estimation, a decision will be reached by the two bodies as to whether or not to proceed <br />further, to construction documents and bidding. <br />Based on the action taken by our Boards, we have asked Arbuckle Costic Architects, Inc. to <br />move ahead with the next steps of design work, consistent with their direction. This letter <br />serves to formally confirm our direction to complete any needed elements of schematic design <br />and proceed ahead to design development and cost estimation, in accordance with the <br />provisions of the agreements which have been reached to guide this project (the interim <br />agreement, the addendum to the interim agreement, the AIA contract, the supplemental <br />provisions of the AIA contract, and the Federal contract requirements). <br />On behalf of the District and the County, we are looking forward to working with you and <br />your firm to complete theses next stages of work. <br />Sincerely, <br />Whittington <br />Project Coordinator <br />Salem Transit District <br />~ <br />Billy asson <br />Project Coordinator <br />Marion County <br />cc Nick Hockens, FTA <br />
The URL can be used to link to this page
Your browser does not support the video tag.