My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arbuckle Miscellaneous
>
CS_Courthouse Square
>
Arbuckle Miscellaneous
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:13:51 PM
Creation date
8/2/2011 2:04:50 PM
Metadata
Fields
Template:
Building
RecordID
10376
Title
Arbuckle Miscellaneous
Company
Arbuckle/Costic
BLDG Date
1/1/1998
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ARBUCKLE COSTIC ARCHITECTS, INC. <br />~3 S~ S~t Memorandum <br />Salem, Oregon 97301-3533 <br />(503) 581-4114, Fax (503) 581-3655, E-Mail: acarch@open.org <br />To: Development Team <br />From: Leonard Lodder, A.IA. <br />Subject: ac~,~ce usc <br /> Courthouse Square <br /> Project No. 9828 <br />Date: November 3, 1998 <br />I. Altsrnate No. I(Add): Increase parking from base bid of 192 spaoes to 258 spaces in underground parking garage, between <br />Gridlines 5b and 3b. <br />2. Alternate No. 2(Add): Ina~ease parking from 258 spa~oes to 3 I 3 spaces in underground parking garage, between Gridlines 3b <br />and I. Add corner pavilion structure az northw~est corner and stair at northeast corner. <br />3. Alt~e No. 3(Add): Install surface streetscape along Chemeketa Sd~eet as identified on drawings, induding paving system, <br />asphalt concrete restoration in strcet, street furnlture, and lighting. (Base bid to Indude undergrou~ work as identifled.) <br />PerFormance of this work to be oontiguous with other streetsrape improvementx designed for this proJect. <br />4. Alternate No. 4(Add): Same as Alternate No. 3 above, but timing of installation to be delayed up to 18 months after <br />completion of work for base bid. <br />5. Alternate No. 5(Add): Supply and install parking a~coess ramp snow mdt system ~ designed with all oonuols. <br />6. Alternate No. 6(Add): Supply and install fixed audlence seating to Hearing Room 1233. <br />7. Alternate No. 7(Adc~: Supply and install relites to conference rooms 220 I, 3 I 2 I, 320 I, 3252, 3282, 4 I 01, 4 I 55, 4 I 57, 4281, <br />and 4297. <br />8. Alternate No. 8: Delete non-firerated interior metal stud and gypsum board partition aomplete with door frames to tenant <br />areas on 2nd, 3"d, and 4"' Floors and replace with demountable partitioning system. <br />9. Alternate No. 9(Add): Substitute recyded materials as per schedule for Solid Waste Department on 5"' floor. <br />10. Aiternate No. 10 (Add): Supply and install grease duct to west med~anical shaft. <br />END OF MEMO <br />9828.38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.