My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arbuckle Miscellaneous
>
CS_Courthouse Square
>
Arbuckle Miscellaneous
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:13:51 PM
Creation date
8/2/2011 2:04:50 PM
Metadata
Fields
Template:
Building
RecordID
10376
Title
Arbuckle Miscellaneous
Company
Arbuckle/Costic
BLDG Date
1/1/1998
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
November 24, 1998 <br />Billy Wasson <br />Project Co-Coorclinator/Director of Corrections <br />Marion County <br />4040 Aumsville Highway SE <br />Salem, Oregon 97302 ' ~ <br />Kim Arbuckle, AIA <br />Alan E. Costic, AIA <br />Walter E. Bensman. Jr., fVA <br />Claycon Vorse, AIA <br />Leonard Lodder,fUA <br />Richard S. Rotliweiler, A(A <br />Richard S. Boyd, AIA <br />Phillip K Settecase, FAIA <br />ARBUCKLE COSTIC ARCHITECTS,- INC. <br />363 State Street <br />Salem, OR 97301-3533 <br />503/581-4114 F~x: 503/581-3655 <br />Eavl~il: acarch~open.org <br />RE: interior Design Services <br />Solid Waste Department <br />Courthouse Square <br />Projed No. 9828 <br />Dear Billy: <br />Per our discussions during our meeting Thursday, NovembeF 19, 1998, we are prepared to provide the <br />inte~ior design of Solid Waste spaces as an Add Aftemate to the design. Since the value of services <br />provided by our interior's staff will probably exceed the fee detta generated by the add aftemate price, we <br />~ are proposing an hourly basis with a not to-exceed amouM developed as follows: <br />1. Consultation and prepar'ation of construction documents: <br />a. Interior Designer. 70 hours @$50/hr. _$3,500. <br />b. Projed Architect: 4 hours (d,i $70/hr. _$280. <br />2. Bidding Phase: Included. <br />3. Construdion Review and Contract Administration: <br />a. Interior Designer. 16 hrs ~$50mr. _$800. <br />c. Project Architect: 4 hrs @ 70/hr. _$280. <br />Total not to exceed $4.860. <br />Jim Sears has expressed concem that the department not be paying twice for the same service. I have <br />reviewed the documerrtation prepa~+ed by Harding Lawson Assodates and note that ~t represeMs a resou~ce <br />of mate~ials with recycled content, but does not necessarily address servicability and life cycte costs. <br />Sincer y, <br />odder, A.IA. ~ <br />Archited <br />LL:as <br />cc: John Whittington. Salem Area Transit <br />Craig Lewis, Melvin Mark Development Company <br />9828.1 A <br />
The URL can be used to link to this page
Your browser does not support the video tag.