My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arbuckle Miscellaneous
>
CS_Courthouse Square
>
Arbuckle Miscellaneous
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:13:51 PM
Creation date
8/2/2011 2:04:50 PM
Metadata
Fields
Template:
Building
RecordID
10376
Title
Arbuckle Miscellaneous
Company
Arbuckle/Costic
BLDG Date
1/1/1998
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
/ <br />Mark Young <br />Portland General Electric <br />Re: Courthouse Square <br />Project No. 9828 <br />February 24, 1999 <br />b. Lowering the Strudural Floor Slab at the 'Transformer Room: This slab has <br />already been tipped and sloped as far as it can to meet the exterior grading <br />requirements. These grading requirements are largely influenced by ADA <br />design standarcls for slopes. We would recommend that a temporary steel <br />plate ramp be used to mitigate the transformer access problem, which <br />should probably occur very infrequently. <br />5. Concrete encasement of the primary electrical service is shown on Sheet A2.1.3. <br />We trust you will be able to proceed with Portland General Electric's side of the servicing agreements for <br />this project. <br />Sincer y, <br />L <br />'_ ~--.-~ <br />Leonard Lodder, A.I.A. ' <br />Architect <br />LL:nd <br />cc: Tracy Hokanson, Interface Engineering <br />Randy Curtis <br />~~n <br />Craig Lewis <br />9828.3A <br />~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.