Laserfiche WebLink
,. -~~,x,~,~`~ _ _ . <br />r~ <br />LJ <br />~ <br />i <br />. . ~` <br />J ~;-F <br />a <br />#4 5tebar (1/2" 0) <br />, (See "J" for spacing) <br />2-4" pRA1N ~ <br />KOLES~ , , <br />~ <br />` ~ ' : 1 : <br />~ ~~' G i u i` ~ Two 518" X 8' GRD ~CdS <br />``` ~- -Q ' ~/~ installed by PGE <br />. ~ ~ , <br />g ~ . <br />`~ ~~ . <br />`~.~ L ~ ~ ~ : <br />: ~ <br />SEC. H . <br />E a ~ ~ ~ 0 1~ ~ Crowd secondary conduits <br />11 to outside of opening. <br />C , (PGE wili determine <br />I~ duct number and size.) <br />I Two foot min. between nearest <br />KEEP THIS AREA CLEA FRONT OF PAD c. duct and pri. duct. <br />ALL DIMENSIONS IN INCHES (Be sure to allow for load growth.) <br />KVA A B C D E G H J <br />75-112 ~ 66 72 16 38 10 10 44 14 <br />'150 - 225 66 72 16 42 10 10 44 10 <br />300 - 500 72 72 '16 42 12 10 44 8 <br />750 - 1000 96 96 14 46 12 12 51 8 <br />1500 96 96 14 56 14 12 51 6 <br />2000-2500 108 96 14 60 '14 12 51 6 <br />NOTES: <br />1. Concrete slab to be 5' thick up to and including 500 kva units. The 750 KVA and 2500 KVA units to have slabs <br />with 8" thickness. <br />2. For complete specifications, see STD. LG257-30-01. <br />3. See STD. LC-257~0-10 fOr conduit and excavation details. <br />4. Vaufts may be required under cable compartments if more than four secondary conduits are required. Consult <br />regional engineer for vaults dimensions (See STD. LC-257~5-01). <br />PGE PROPRIEfARY MATS2IAL - THIS INFO IS BASED ON ASSUMPT10N5 3 CRffER~A WHICFI MAY NOT BE VAL1D OUfSIDE T}iE PGE ELECTRIC SYSTEM - FOR INT6iNAL USE ONLY <br />THREE PHASE TRANSFORMER PAD DESIGN X CONSTRUCTION <br />SLAB CONSTRUCTION AND DETAILS T 8~ D STANDARDS <br />~ TRANSFORMERS DATE 10-15-96 <br />P.G.E. CO. STANDARD LC-257-40-01 <br />