My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arbuckle Miscellaneous
>
CS_Courthouse Square
>
Arbuckle Miscellaneous
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:13:51 PM
Creation date
8/2/2011 2:04:50 PM
Metadata
Fields
Template:
Building
RecordID
10376
Title
Arbuckle Miscellaneous
Company
Arbuckle/Costic
BLDG Date
1/1/1998
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ARBUCKLE COSTIC ARCHITECTS, INC. <br />363 State Street <br />Salem, Oregon 97301-3533 <br />(503) 581-41 14, Fa~c (503) 581-3655, E-mail: acarch@open.org <br />ARCHITECT'S <br />SUPPLEMENTAL INSTRUCTION <br />PROJECT: Courthouse Square <br />555 Court Street NE <br />Salem, Oregon 97301 <br />OWNER: /Marion County and Salem Area Mass Transit <br />100 High Street NE District <br />Salem, Oregon 97301 3140 Del Webb Ave NE <br />Salem, Oregon 97303-4165 <br />CONTRACTOR: Pence/Kelly Construction, Inc. <br />2747 Pence Loop SE <br />Salem, Oregon 97302 <br />SUPPLEMENTAL 001 <br />INSTRUCTION NUMBER: <br />DATE: May 27, 1999 <br />ARCHITECTS PROJECT <br />NO.: 9828 <br />CONTRACT FOR: General <br />Construction <br />CONTRACT DATED: February 17, 1999 <br />The Work shall be carried out in accordance with the following supplemental instructions issued in accordance with the Contract <br />Documents without change in Contract Sum or Contract Time. Proceeding with the Work in accordance with these instructions <br />indicates your acknowledgment that there will be no change in the Contract Sum or the Contract Time. <br />D@SCfIptI0f1: (Written description of the Work) <br />Change the required camber of the bottom cord of the steel trusses from the 10" indicated to 16" to improve clearance <br />between the underside of the weather protection supported by these trusses and the transit mall surface below. <br />1N3Wlat/d34 S3~IAd3S <br />laOddflS ~IJ.Nf10~ NOI~it/W <br />sss~ z Nnr <br />a <br />~ao~a~~ <br />Issued by Architect: <br />Arbuckle Costic Architects, Inc. <br />363 State Street <br />Salem, Ore 973 1- 33 <br />Date: pS Z~ /°~~ <br />cc Craig Lewis, Melvin Mark Development Co. <br />File: 982&11 C <br />
The URL can be used to link to this page
Your browser does not support the video tag.