My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arbuckle Miscellaneous
>
CS_Courthouse Square
>
Arbuckle Miscellaneous
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:13:51 PM
Creation date
8/2/2011 2:04:50 PM
Metadata
Fields
Template:
Building
RecordID
10376
Title
Arbuckle Miscellaneous
Company
Arbuckle/Costic
BLDG Date
1/1/1998
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
JUN-04-99 FRI 16:39 ARBUCKLE COSTIC ARCH ING FAX N0. 5035813655 <br />PRODUC_TS <br />2. I PATCHiNG MATERIALS <br />A. Ductwoi'k and Housings: Use plastic plugs with rctainers to patch drilled holes. <br />2.2 lNSTRUMENTS <br />A. Utilize test instruments and equipment as recommPnded in the following: <br />P. 03/08 , _ <br />I. NEBB's Procedural5tandards for Testing, Adjusting and Balanc+ng of EnvironR~ental <br />Systems. <br />2. AABCs Manua) MN- I,"MBC National $tandar-ds.° <br />EXEGUTION <br />3.1 VERIFICATION OF CONDITIONS <br />A. Uo not proceed with testing, adjusting and balancing work urrtil work has been completed and <br />is operable. Do not proceed until work scheduled for tesrting, adjusting and balancing is clean <br />and frE:e from debris, di~t and discarded building materials_ <br />B. Verify th~ following: <br />I. Fquipment is operable and in a safe and normal condition. <br />2. Temperature control syst~ms are installed complete and operable. <br />3, Fit~al filtcrs are dcan and in place. <br />4. Duct systems a-e cl~an of debris. <br />5. C:orrett fan rotation. <br />6. Dampers anr. in place and open. <br />7. A~ccess daors are dosed. <br />8. Airoudets ~re installed and connected. <br />9. F7e~aort any defects or deficiencies noted during performance of services to Architect. <br />Prompdy report abnormal conditions in Mechanical Systems or conditions which <br />prever~t system balance. <br />C. Automatic ~remperature Control Systems: <br />I. Set and adjust automatically operated devices to achieve ~quired sequence of <br />operations. Coordinate with the automatic temper~l:ure control supplier. Do itot <br />proceed without his representation. <br />3.2 'rCST HOLE LOCP,TIONS <br />A. Install test h~les at the inlet and outlet of all air handling un'rt fans, exhaust fans, utility fans, and <br />ttie like, and elsewhere as r~quired to faciliiate traverses ~r~d to test the air systems. Plug holes <br />when finished. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.