Laserfiche WebLink
JUN-04-99 FRI 16:39 ARBUCKLE COSTIC ARCH ING FAX N0. 5035813655 <br />PRODUC_TS <br />2. I PATCHiNG MATERIALS <br />A. Ductwoi'k and Housings: Use plastic plugs with rctainers to patch drilled holes. <br />2.2 lNSTRUMENTS <br />A. Utilize test instruments and equipment as recommPnded in the following: <br />P. 03/08 , _ <br />I. NEBB's Procedural5tandards for Testing, Adjusting and Balanc+ng of EnvironR~ental <br />Systems. <br />2. AABCs Manua) MN- I,"MBC National $tandar-ds.° <br />EXEGUTION <br />3.1 VERIFICATION OF CONDITIONS <br />A. Uo not proceed with testing, adjusting and balancing work urrtil work has been completed and <br />is operable. Do not proceed until work scheduled for tesrting, adjusting and balancing is clean <br />and frE:e from debris, di~t and discarded building materials_ <br />B. Verify th~ following: <br />I. Fquipment is operable and in a safe and normal condition. <br />2. Temperature control syst~ms are installed complete and operable. <br />3, Fit~al filtcrs are dcan and in place. <br />4. Duct systems a-e cl~an of debris. <br />5. C:orrett fan rotation. <br />6. Dampers anr. in place and open. <br />7. A~ccess daors are dosed. <br />8. Airoudets ~re installed and connected. <br />9. F7e~aort any defects or deficiencies noted during performance of services to Architect. <br />Prompdy report abnormal conditions in Mechanical Systems or conditions which <br />prever~t system balance. <br />C. Automatic ~remperature Control Systems: <br />I. Set and adjust automatically operated devices to achieve ~quired sequence of <br />operations. Coordinate with the automatic temper~l:ure control supplier. Do itot <br />proceed without his representation. <br />3.2 'rCST HOLE LOCP,TIONS <br />A. Install test h~les at the inlet and outlet of all air handling un'rt fans, exhaust fans, utility fans, and <br />ttie like, and elsewhere as r~quired to faciliiate traverses ~r~d to test the air systems. Plug holes <br />when finished. <br />2 <br />