Laserfiche WebLink
JUN-04-99 FRI 16:40 ARBUCKLE C05TIC ARCH INC FAX N0. 5035813655 P.06/OS <br />:3.9 DUCT TRAVERSE TESTING <br />A. System zonP/branch. <br />B. Duct size. <br />C- Area. <br />f.~. Design v~~ocity_ <br />~. Design air flow. <br />F. Test velociry. <br />G. Test air flow. <br />H. Duct stalic pressurr. <br />!. Air temperature. <br />J. Air correction factor. <br />3.10 AIR ~ISTRIPU7IUN TESTING <br />A_ Air terminal number. <br />B. ~Koom number/location, <br />C. Termi~al type. <br />D. Terminal size. <br />E. Design velocity. <br />F. Design air flow. <br />C;. Test (final) velocity. <br />H. Test (final) air flow. <br />I. Percent of de~ign air flow. <br />3.1 I TERMINAL UNITTES'rING <br />A Manufaclurer. <br />B. 'rype (i.e., constant, variai~le, singfe, dual duct). <br />C. Identification/number. <br />D. Location. . <br />E. Model. ~ <br />F. Size, <br />G. Minimum static pressurP. <br />H. Minimum design air (low. <br />I. Mdximw-n cJesign air flow. <br />J. Maximum adual air flow. <br />K. Inlet static pressure. <br />L. Inlet and outiet temperature at full heat. <br />M. Electric Heater Coil Data: KW, vol~age, phase, <br />3.12 DUCT PRCSSURE SENSOR (VAV SYSTEM) TESYING <br />A. Location. <br />B. Stati~ pressure with fan at block load airflow. <br />S <br />