My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arbuckle Miscellaneous
>
CS_Courthouse Square
>
Arbuckle Miscellaneous
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:13:51 PM
Creation date
8/2/2011 2:04:50 PM
Metadata
Fields
Template:
Building
RecordID
10376
Title
Arbuckle Miscellaneous
Company
Arbuckle/Costic
BLDG Date
1/1/1998
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
January 4, 2000 <br />Glen Cook, P.E. <br />Executive ~ce Preside~t <br />Century West Engineering Corpo~ation <br />549 SW MiN Vew Way <br />Bend, Ot~egon 97702 <br />RE: Contract for Structural Engineering Services <br />Cou~thouse Square, Salem. O~egon <br />Projed No. 9828 <br />Dear Gien: <br />Kim ArbuCkie. AIA <br />Alan E. Costic. AIA <br />Walter E. Bensman. Jr.. fVA <br />CNyton Vorse. NA <br />Mark M. Foster, fVA <br />Leonard Lodder,fVA <br />Richard S. Rothweiler, AIA <br />ARBUCKLE COSTIC ARCHITECTS, INC. <br />363 State Street <br />Salem, OR 97301-3533 <br />503/581-4114 Fax: 503/581-3655 <br />E-N1~iC acarcl~Copen.org <br />On July 26.1999, we sent you a letter requesting Garification conceming the arrangements made with Tim <br />Terich to continue to provide stnadurai engineering services for the Courthouse Square project. To date, <br />we have not received any clarification. We undetstand that since the departure of Tim Terich, Century West <br />Engineering no longer maintains a full time structural e~gineering depa~tment. Without a written assurance <br />that Century West Engineering Corporation has made amangements to continue retaining Tim Terich as <br />Engi~eer of Record fo~ the projed for the duration of the projed and to compiete your obligations outlined <br />in the contract fo~ services dated September 3,1999, we feel compelied to withhold fu~ther payment on this <br />account. <br />We took forvva~d to a timely response to this letter. <br />Sincerely, <br />Leonani Lodder, A.f.A. <br />Archited <br />LL:gnv <br />cc: Craig Lewis, Melvin Mark Developme~t Company <br />Biliy Wasson. Marion County <br />John Whittington, Salem Area Mass Transit <br />Tim Terich, Century West Engineering <br />9828.1 B <br />
The URL can be used to link to this page
Your browser does not support the video tag.